My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-13_REVISION - M1984044
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984044
>
2006-02-13_REVISION - M1984044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:13 PM
Creation date
11/21/2007 7:26:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984044
IBM Index Class Name
Revision
Doc Date
2/13/2006
Doc Name
Application
From
American Gypsum
To
DMG
Type & Sequence
TR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Knight Piesold <br /> C ONSYLT~NG <br />I <br /> 295 (11) Moisture of fine and coazse aggregate <br /> 296 <br /> 297 (12) Gallons of batch water (including ice) The Contractor shall add the following information to <br /> 298 the batch ticket at the placement site: <br /> 299 <br /> 300 (13) Gallons of water added by truck operator plus quantity of concrete in the truck each time <br /> 301 water is added <br /> 302 <br />303 <br />(14) Number of revolutions of drum at mixing speed (for truck mixed concrete) <br /> 304 <br /> 305 <br />306 (15) Discharge time <br /> 307 (16) Location of batch in placement <br /> 308 <br />309 <br />(17) Water cement ratio (required for deck concrete only) The drum on each truck mixer shall be <br /> 310 reversed prior to charging to eliminate any wash water remaining in the mixer. <br /> 311 <br />312 <br />(a) Portland Cement and Fly Ash. Either sacked or bulk cement may be used. No fraction of <br /> 313 a sack of cement shall be used in a batch of concrete unless the cement is weighed. <br /> 314 <br /> 315 All bulk cement shall be weighed on an approved weighing device. The bulk cement <br /> 316 weighing hopper shall be sealed and vented to preclude dusting during operation. The <br /> 317 discharge chute shall be so arranged that cement will not lodge in it or leak from it. <br /> 318 <br /> 319 Separate storage and handling equipment shall be provided for the fly ash. The fly ash <br /> 320 may be weighed in the cement hopper and discharged with the cement. <br /> 321 <br /> 322 (b) Water. Unless water is to be weighed, the water-measuring equipment shall include an <br /> 323 auxiliary tank from which the measuring tank shall be filled. The measuring tank shall <br /> 324 be equipped with an outside tap and valve to provide for checking the calibration unless <br /> 325 other means are provided for readily and accurately determining the amount of water in <br /> 326 the tank. The volume of the auxiliary tank shall be at least equal to that of the measuring <br /> 327 tank. In lieu of the volume method specified above, the Contractor will be permitted to <br /> 328 use a water metering device that is accurate within the prescribed limits. <br /> 329 <br /> 330 (c) Aggregates. Aggregates from different sources and of different gradings shall not be <br /> 331 stockpiled together. <br /> 332 <br /> 333 Aggregate shall be handled from stockpiles or other sources to the batching plant in such <br /> 334 manner as to secure a uniform grading of the material. Aggregates that have become <br /> 335 segregated, or mixed with earth or foreign material, shall not be used. All aggregates <br /> 336 produced or handled by hydraulic methods, and washed aggregates, shall be stockpiled <br /> 337 or binned far draining at least 12 hours before being batched. Rail shipment requiring <br /> 338 more than l2 hours will be accepted as adequate binning only if the car bodies permit <br /> <br /> 3-37 <br /> G:11011W 100.OMVteports\KV1TeU~niwl SpecificaLOns tloc Fabwry 3, 2006 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.