Laserfiche WebLink
L <br />35 <br />36 <br />and form a substantial bond. Excavation for toe or cut-off walls shall be made to the neat lines of <br />the wall. Allowance will not be made for work outside the neat lines. <br />1 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />506.04 Method of Measurement. Riprap of the sizes specified in the Contract will be <br />measured by the ton or by the cubic yard. Cubic yards will be by the method of average end <br />areas based on dimensions shown on the plans or ordered. <br />506.05 Basis of Payment. The accepted quantities of riprap will be paid for at the contract <br />unit price per cubic yard or per ton. <br />Payment will be made under: <br />Pay Item Pay Unit <br />Riprap winch) Cubic Yard or Ton <br />Structure excavation will be measured and paid for in accordance with Section 206. <br />Riprap (Gabions) and Slope Mattress <br /> <br />1 <br /> <br /> <br /> <br /> <br />52 506.06 Description. This work consists of the construction of riprap in ~rire mesh gabions and <br />53 in wire mesh slope mattresses in accordance with these specifications and in conformity with the ' <br />54 lines and grades shown on the plans or established. <br />55 <br /> <br />56 <br />506.07 Materials. The wire, wire mesh, cages, anchor stakes and riprap shall conform to ' <br />57 subsection 7]2.09. <br />58 , <br />59 Construction Requirements <br />60 506.08 Gabions and Slope Mattresses. Gabions and slope mattresses shall be placed to <br /> <br />61 <br />conform with the plan details. Riprap material shall be placed in close contract in the unit so that ' <br />62 maximum fill is obtained. The units may be filled by machine with sufficient hand work to <br />63 accomplish requirements of this specification. <br /> <br />64 ' <br />65 Where the length of the unit exceeds its horizontal width the gabion is to lbe equally divided by <br />66 diaphragms, of the same mesh and gauge as the body, into cells whose length does not exceed <br /> <br />67 <br />the horizontal width. The unit shall be furnished with the necessary diaphragms secured in , <br />68 proper position on the base section in such a manner that no additional tying at this juncture will <br />69 be necessary. <br /> <br />70 ' <br />71 (a) Gabions. All perimeter edges of gabions aze to be securely selvedged or bound so that the <br />72 joints formed by tying the selvedges have approximately the same strength as the body of the <br /> <br />73 <br />mesh. ' <br />74 <br />75 The gabion bed shall be excavated to the width, Iine, and grade as staked by the Engineer. <br /> <br />76 <br />The gabions shall be founded on this bed and laid to the lines and dimensions required. , <br /> <br /> 3-28 <br /> G U01 W0100.OYW\Raports\KPReMni~al SpeciOCationsAOC February 3, 20W <br />L <br />