My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-13_REVISION - M1984044
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984044
>
2006-02-13_REVISION - M1984044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:13 PM
Creation date
11/21/2007 7:26:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984044
IBM Index Class Name
Revision
Doc Date
2/13/2006
Doc Name
Application
From
American Gypsum
To
DMG
Type & Sequence
TR7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />469 The time to be measured under this item will be the number of hours that each piece of ' <br />470 equipment is actually used as ordered. Proof rolling will be measured and paid For only once. <br />471 Additional proof rolling shall be at the Contractor's expense. ' <br />472 <br />473 203.14 Basis of Payment. The accepted quantities will be paid for at the contract unit price <br />474 for each of the pay items listed below that appear in the bid schedule. Payment will be made ' <br />475 under: <br />476 <br />477 Pay Item Pay Unit <br />478 Rock Excavation Cubic Yazd <br />479 Rock Fill Cubic Yard <br /> <br />480 <br />Unclassified Excavation Cubic Yazd ' <br />481 Unclassified Excavation <br />482 (Complete in Place) Cubic Yazd <br /> <br />483 <br />Muck Excavation Cubic Yard , <br />484 Borrow Cubic Yard <br />485 Borrow (Complete in Place) Cubic Yard <br /> <br />486 <br />Embankment Material , <br />487 (Complete in Place) Cubic Yazd <br />488 Stripping Cubic Yazd <br /> <br />489 <br />Blading Hour t <br />490 Dozing Hour <br />491 Potholing Hour ' <br />492 Proof Rolling Hour <br />493 <br />494 Water will not be measured and paid for separately but shall be included in the work. ' <br />495 Compaction will not be measured and paid for separately, but shall be included in the work. <br />496 <br />497 Excavated materials which, when specified, require more than one handling prior to final ' <br />498 placement will be paid for at the contract unit price for unclassified excavation, rock excavation, <br />499 stripping, muck excavation, or borrow as appropriate, for the first approved handling. Payment <br />500 for the second approved handling will be made at the same unit price as the first handling, except ' <br />501 that material used in conjunction with another pay item will be paid for in that pay item. <br />502 <br />503 Payment for Unclassified Excavation (Complete in Place), Embankment Material (Complete in , <br />504 Place), and Borrow (Complete in Place) shall be full compensation for all work necessary to <br />505 complete the item including construction of embankments, unclassified excavation, borrow, <br />506 compaction, compaction of bases of cuts and fills, all work in availal3le materials pits, and , <br />507 disposal of excess excavated material. <br />508 <br />509 All costs associated with reducing the size of the claystone particles, removing the oversized ' <br />510 particles, and disposal of the oversized particles wilt not be paid for :;eparateiy but shalt be <br />511 included in the work. <br /> <br />512 ' <br /> <br /> 3-12 <br /> G:11011f1D100.ON+1ReporlslKPlTSrhnical 5,pxi/ica~iww tlx FeEruary 3,1006 <br />iI <br />
The URL can be used to link to this page
Your browser does not support the video tag.