Laserfiche WebLink
Permit or other jab action : Rouflne Bontl Rewlwiatbr <br />Task description : Transport reclamation <br /> Nearest major city or town within project area region: uetta <br />Transoortation Cvcle Time: Non- Total one-way lrevel distance: 5.0 miles <br /> Roadable Raatlable Avereg¢trevel speed: 35.0 mph <br /> Equipment Equipment <br />Haul time (hours)= 0.14 O.fd Total non-roadable mob/demob cost': $1,109.14 <br />Return time (Hours)= 0.14 014 '~munuNro v+m tool do <br />Loading time(bwrs)= 0.50 NA Total roadable nnb/demob cost": 8000 <br />Unloatling time (Hours)= 0.50 NA "one muM tdp, roluul H9 <br />Subtotals= 1.29 0.29 <br />JOB TIME AND COST Total job lime: 5.57 hours <br />Total job cost 51,109 <br />