My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-01-25_REVISION - M1979002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979002
>
2005-01-25_REVISION - M1979002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:44 AM
Creation date
11/21/2007 7:24:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979002
IBM Index Class Name
Revision
Doc Date
1/25/2005
Doc Name
Cost Estimate
From
DMG
To
File
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />Task#: O6a State :Colorado <br />Date: 0124@005 Counry:Delta Abbreviation :none <br />User: SSS Site:NOrth Delta Pit Filename :M002-06a <br />Agency or organization name :OMG <br />Permit or otherjob action :Routine bond recalculation <br />Task aescriptlon :Haul topsoil from stockpile to location to replacement location <br />HOURLY EQUIPMENT COST ~ Basic machine:CAT950G Hora wen ~ 180 <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Data source: (CRGJ <br /> Utilization % <br />Cost Breakdown : Ownership cosUhoun $17.40 NA <br />Opeating cosUhour: $23.73 700 <br />Operetor wsUhoun $31.76 NA <br />Total unit cosVhoun $72.89 Total Fleet cosUhouc 572.89 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume. 5,000 LCY factor. NA volume: 5,000 LCY <br />Source of quantity takeoff :Assumed portion of facilities area separated Irom stockpile location <br />Source of estimated swell factor:NA <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.500 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Material up to 1/8"diameter 0.020 (Cat HB) <br />Stockpile : Conveyor or dozerpiled f 0 ft. high antl up 0.000 (Cat HB) <br />Truck Ownership; NO adjustment-factor not applicable 0.000 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br />Net cycle time adjustment: -0.020 minutes <br />Adjusted basic cycle time: 0.480 minutes <br />Rollino Resistance -Road Conditions <br />Haul :Firm, smooth, rolling, dirNf. suAaced, watered, maintained <br />Relurn :Firm, smooth, rolling. dirVlt. suAaced, watered, maintainetl <br />Permivjob # : M-1979-002 <br />Haul and Retum Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 450 0.00 3.00 3.00 0.3758 (Cat HB) <br />Retum route : 450 0.00 3.00 3.00 0.3514 (Cat HB) <br />Loader Bucket Caoac'N <br />Rated capacity: <br />Bucket fdl faGfer ~. <br />3.75 LCY (heaped) (Cat HB) <br />L700 Other-rack/dirt mixtures <br />Total travel time: 0.7271 minutes <br />Total cyGe time : 1.207 minutes <br />Adjusted capacity: 4.12 LCY <br /> Source <br />Job Condi[lon Correction Factors Alfitude adjustment factor 1.00 ~ (Cat HB) <br />Site altitude: 4,940 feet Job effciency factor: 0.83 (l shiftPoay) <br /> Net correction: 0.83 multiplier <br />Unadjusted hourly unit production : 205.04 LCY/Hr <br />Adjusted hourly unit production : 170.78 LCV/Hr (Car HB) <br />Adjusted houny fleet Droduclion : 170.18 LCY/Hr <br />JOB 71ME~AND COST <br />Fleet size: 7 Loaderis) Total job time: 29.38 Hours <br />Unit wst $0.428 /LCY Total job cost: 52,142 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.