NOU-16-1994 13 18 FROM STEIGERS CORPORRTIDN TO ~ 3038328106 P.03i03 <br />,DEMOLITION COST ESTIMATE <br />Structure /Facility /Equipment Description Cost <br />Admin and Lab Building Superstructure $ 15,437.00 <br />Hear Exchanger Building Superstructure $ 72,939.00 <br />Compressor Building Superstructure $ 30,565.00 <br />Process Building Superstructure $ 410,281.00 <br />Pumphouse Building Superstructure $ 16,672.00 <br />Fin-Fan Cooler $ 15,630.00 <br />Return Water Collection Tank $ 46,558.00 <br />Pipeline Feed Surge Tank $ 26,188.00 <br />Substation $ 9,455.00 <br />Package Generator $ 868.00 <br />Outdoor Switch Gear $ 2,171.00 <br />Admin Building Slab with Rods $ 8,722.00 <br />Processing Facility Slab with Rods $ 133,734.D0 <br />Substation Slab with Rods $ 145,363.00 <br />Package Generator Slab with Rods $ 1,635.00 <br />Outdoor Switch Gear Slab With Rods $ 2,442.00 <br />Nitrogen Pad Slab with Rods $ 2,180.00 <br />Fuel Storage Pad Slab with Rods $ 523.00 <br />Spread Footers Various $ 32,996.00 <br />Column Supports Under Processing Facility $ 1,389.00 <br />Above Ground Transmission Line $ 18,814.00 <br />Stormwater Pond Liner $ 2,144.00 <br />Demolish and Remove Asphalt from Access Road $ 139,164.00 <br />Remove Fence Facilities Area and Stormwater Pond $ 5,934.00 <br />Install Livestock Exclusion Fence 0-5 year Panel $ 8,914.00 <br />Remove Livestock Exclusion Fence 0-5 year Panel $ 5,968.00 <br />Concrete Disposal $ 217,422.00 <br />Total $1,374,106.00 <br />3,256 lin.ft. x 1.70 + 7.2°I° <br />7,230 lin.ft. x 1.15 + 7,2 °!° <br />This cost estimate includes: <br />Processing Facilities Area <br />1-acre Stormwater Retention Pond <br />Asphalt Road <br />Fuel Storage Area <br />Live Stock Exclusion Fence <br />Above Ground Transmission Line <br />TnTO+ a rw~ <br />