This page was updated in cpniunction with the USR Application. June 23. 2005 <br />existing roads and new roads will be restored to their original condition or reclaimed to <br />grass land. <br />Mine Schedule <br />The Riverbend Operation will process approximately 2 million tons of aggregate per year <br />and mine approximately 25 - 30 acres per year. At this rate, Lafarge anticipates mining and <br />reclaiming the Site in approximately 30 years; however, the rate of mining and overall life <br />of mine is dependent upon demand and market conditions. <br />The mine phases and associated mine cells are depicted in Exhibit C. Mining in phases <br />will limit the area of disturbance at any one time. The phases depicted in Exhibit C are <br />used to indicate the direction of mining. These phases are neither representative of the <br />maximum area of disturbance nor do they limit disturbance to a particular phase. <br />Generally; Lafarge believes the mine will progress according to the following time table: <br />Table 2. <br />F[. Lupfon Pif <br />DMG 211 Permi! <br />Page !S of 86 <br />