My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-18_REVISION - M1998071 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998071
>
2007-06-18_REVISION - M1998071 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:08:07 PM
Creation date
11/21/2007 7:20:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998071
IBM Index Class Name
Revision
Doc Date
6/18/2007
Doc Name
Cost Summary Form
From
DRMS
To
Fryrear Gravel Pit
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/haur/unit (No. units) Cost/hr/fleet Cost/hr/fleet <br />-Light Duty Pickup, 4x4, 3/4 T. $46.30 1 $46.30 $46.30 <br />-Fuel Tanker, 4x2, 170 HP $64.11 1 $64.11 $64.11 <br />-Cube Truck, 4x2, 170 HP $72.01 1 $72.01 $72.01 <br />Subtotals :~ $182.42 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Holyoke <br />Transportation Cvcle Time : Mort- Total one-way travel distance : 15.0 miles <br /> Roadable Roadable Average travel speed : 55.0 mph <br /> Equipment Equipment <br />Haul time {hours) = 0.27 0.27 Total non-roadable mob/demob cost' : $2,675.17 <br />Retum time (hours) = 0.27 0.27 ' Mro rountl trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost " : $99.50 <br />Unloading time (hours) = 1.00 NA "one round trip, no haul rig <br />Subtotals = 2.55 0.55 <br />JOB TIME AND COST Total job time : 5.09 hours <br /> Total iob cost : 52.775 <br />
The URL can be used to link to this page
Your browser does not support the video tag.