My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-06-18_REVISION - M1998071 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998071
>
2007-06-18_REVISION - M1998071 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:08:07 PM
Creation date
11/21/2007 7:20:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998071
IBM Index Class Name
Revision
Doc Date
6/18/2007
Doc Name
Cost Summary Form
From
DRMS
To
Fryrear Gravel Pit
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date : 06/18x1007 <br />User: ESC <br />State :Colorado <br />County :Yuma <br />Site : Fryrear Grave! Pit <br />Permif/job# :14F1998-071 <br />Abbreviation :none <br />Filename : M071-002 <br />Agency or organization name : DRMS <br />Permit or other job action : CN-Of <br />Task description : Repla <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : RODS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour ; $72.92 NA <br />Operating cosUhour : $98.84 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $204.53 Total fleet cosUhour : x204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 9,306 LCY factor : NA volume : 9,306 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : Z00 feet <br />Unadjusted howdy production : 700.0 LCYIhr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Loam <br />0.00 <br />2,100 Ibs/LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dazing method : i.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : f. f0 <br />Blade type : i.00 <br />Net correction : 0.55 <br />Adjusted unit production : 381.66 LCY/hr <br />Adjusted fleet production : 381.86 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 24.38 Hours <br />Unit cost : $0.536 /LCY Total job wst : $4,987 <br />
The URL can be used to link to this page
Your browser does not support the video tag.