Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 007 <br />Date : 08/31/2007 <br />User : KAP <br />State : Colorado PermiUjob# : M-2000-030 <br />County :La Plata Abbreviation :none <br />Site :Agri-Dld Gravel Pit Filename :M030-007 <br />Agency or organization name :Colorado Division Of Reclamation <br />Permit or other job action : SO <br />Task description :Spread Topsoil on Pit Floor <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br /> OperatingcosUhour : $98.84 100 <br /> Ripper op. cosUhour : $0.00 0 ' <br /> Operator cosUhour : $32.78 NA <br /> Total unit cost/hour : $204.53 Total fleet cosUhour : $204.53 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 12,000 LCY factor : NA volume : 12,000 LCY <br /> <br />Source of estimated volume :Reclamation Plan and Site Inspection <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.20 (Cat Hl3) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Loose stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,600 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2 550 Ibs/LCY Net correction : 0.54 <br />Weight description <br />Earth -Dry packed <br />Adjusted unit production <br />Adjusted fleet production <br />669.14 <br />669.14 LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 17.93 Hours <br />Unit cost : $0.306 /LCY Total job cost : $3,668 <br />And <br />