Laserfiche WebLink
.................... . <br />_._ <br />ROADABLE EQUIPMENT sheet 2 of 2~ <br />Machine <br />Description Total <br />CosUhour/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />Cost/hr/fleet <br />-Generic 8-10 cy, 6x4 $63.65 2 $127.30 $127.30 <br />-Light Duty Pickup, 4x4, 3/4 T. $30.69 1 $30.69 $30.69 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Suh4M~lc 2~co ~~ @I C> nn <br />a. <br />EQUIPMENT HAUL DISTANCE and TIME <br />Haul time (hours) = 0.38 0.38 Total non-roadable mob/demob cost * : $2,730.11 <br />Return time (hours) = 0.38 0.38 ' hvo rountl trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost ** : $118.50 <br />Unloading time (hours) = 1.00 NA "one round trip, no haul rig <br />Subtotals = 2.75 0.75 <br /> <br />JOB TIME AND COST Total job time : ~~~ 5,50 <br /> Total job cost : $2,849 <br />hours <br />