Laserfiche WebLink
<br />-5- <br />Maps and E:blb@a; <br />Two {2) wmplete, unbound application packages must be submitted. One complete application package wnsists of a signed application form <br />and the se[ of maps and exhibits referenced below as Exhibits A•S, Addendum 1, and the Geotechnical Stability Exhibit. Each exhibitwithinthe <br />application must be presented as a separate srxtion. Begin each exhibit on a new page. Pages should be numbered consecutively for ease of <br />reference. If separate documents are used as appendices, please reference these byname in the exhibit. <br />With each of the two {2) signed application forms, you must submit a corresponding set of the maps and exhibits as described N the following <br />references to Rule 6.4, 6.5, and L6.2{ I xb): <br />F.}G-QB[T A Legal Description <br />F,XHIBIT B Index Map <br />EXIttBIT C Pre-Mining and Mining Plan Map(s) of Affected Lands <br />EXHIBIT D Mining Plan <br />EXHIBIT E Reclamation Plan <br />EXHIBIT F Reclamation Plan Map <br />EXHBIT G Water Information <br />EXHIBffH Wildlifelnformation <br />EXHIBIT [ Soils Information <br />EXHIBIT 1 Vegetation Information <br />EXHIBIT K Climate Information <br />F.XHB[T L Reclamation Costs <br />EXHIBIT M Other Pernits and Licenses <br />EXFIIDITN Source ofl.egalRight=fo-Enter <br />EXHIBIT O Owners of Record of Affected Land (Stufacc Area) and Owners of Substance to be Mined <br />FJG-IIBIT P Municipalities Wilton Two Miles <br />F.XH®IT Q Pru~uf of Mailing of Notices to County Commissioners and Conservation District <br />EXHIBIT R Yroof of Filing with County Clerk or Recorder <br />EXI-IIBIT S Permanent Man-Made Structures <br />Rule1.6.2(1)(b) ADDEND[IMI-NoticeRequrrem~tts(sample enclosed) <br />Rule 6.5 Geotechnieal Stability Exhibit (any required sections) <br />The instructions for preparing Exhibits A-S. Addendum I, and Geotechnical Stability Exhibit are specified under Rule 6.4 and 6.5 and <br />Rule L6.2(I)(b) of the Rules and Regulations. Lf you have any questions on preparing the Exhibits or content of the information required, or <br />would Tike to schedule apre-application trreeting you may contact the ice at 303-866-3567. <br />Responsibilities as a Permittee: <br />Upon application approval and permit issuance, this application becomes a legally binding document. Therefore, there are a <br />number of important requirements which you, as a pt:rmittee, should fully understand. These requirements aze listed below. <br />Please read and initial each requirement, in the space provided, to acknowledge that you understand your obligations. Ifyou do not <br />understand these obligations then please contact this Office for a full explanation. <br />1. Your obligation to reclaim the site is not limited to the amount of the financial warranty. You assume legal <br />liability for all reasonable expenses which the Board or the Office may incur to reclaim the affected lands associated <br />with your mining operation in the event your permit is revoked and financial warranty is forfeited; <br />