Laserfiche WebLink
STATE OF COLORADO <br />BOARD OF EXAMINERS OF WATER WELL CONSTRUCTION AND PUMP EVSTALLATION CONTRACTORS op~co~ <br />Division of Water Resources "-F'~ ~ 'Pf <br />N`~ <br />1313 Shemgn Stree[, Raom 818 ~ © (-~ ~ <br />Drnver,C080203 IlLt 111^J/) * ` <br />Phone (303) 866-3581 February 25, 2005 ~ ~ re,e <br />FAX (303) 866-3589 <br />Bill Owrns <br />http://www.wa[crstate.co.us/bce Governor <br />Russell George <br />Executive Directoq DNR <br />Loveland Ready Mix Concrete, Inc. <br />Attn: Steve Fancher Hal D. Simpson, P.E. <br />P.O. BOX 299 Secretary <br />Loveland, CO 80539-0299 <br />Re: Request for Variance, Install Pumping Equipment in a Gravel Pit Well, Permit No. 62009-F, Section 16, <br />Township 5 North, Range 69 West, 6th P.M., Lorimer County. <br />Request No: 2005-022A <br />Dear Mr. Fancher: <br />A request for variance for the installation of pumping equipment in a gravel pit was submitted by you on <br />February 25, 2005. The request has been reviewed for the Board of Examiners of Water Well Construction and <br />Pump Installation Contractors. The request is specifically for a variance from the well construction standards to <br />allow the installation of pumping equipment in a gravel pit well to provide water from the gravel pit well for <br />concrete botching, aggregate mining, and dust suppression purposes. <br />Pursuant to Board Policy 2000-4 and the authority granted by the Board, the required variance to the <br />Rules is granted subject to the following conditions: <br />1. Every necessary means and precautions to prevent contaminants from entering the gravel pit well shall be <br />taken. <br />2. Pumping equipment shall be installed in accordance with the limitations for production rate specified on the <br />well permit. <br />3. Water from the gravel pit well shall be not be used for human consumption. , <br />4. Rule 15 concerning disinfection standards is hereby waived for the gravel pit well and the installation of <br />pumping equipment in the gravel pit well. <br />Granting the request for variance to minimum well construction and pump installation standards does <br />not relieve the owner of potential responsibility or liability in the event contamination of the water source results <br />from such construction, nor does the grantor assume any responsibility or liability should contamination occur. <br />If you have any questions concerning this matter, please contact this office. <br />Sincerely, <br />Dave McElhaney, P.G. Gllo(/ <br />Chief, Geotechnical Services Branch <br />cc: Well File <br />TIMOTHY L. DECKER, Montrose; H. RAY NEWMYER, Moss; JEFFREY K. CANFIELD, Fort Morgan, GREG NAUGLE, Denver <br />