Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : DRMS <br />002 State :Colorado <br />07/11/2007 <br />BMK <br />County :Pueblo <br />Site :Pueblo East <br />Permit or other job action :Amendment <br />Task description :APPLY 12 INCHES OF TOP SOIL <br />;, ;:: ,. <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Description <br />Scraper work team -Scraper :Cat 627G w/push-pull <br />-Push dozer : NA <br />Support equipment-Load area :Cat D7R DS Series 11 LGP- 7S <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-W ater truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Impart data filename : scraper2 NA dozer NA NA NA <br />Utilization-machine : 100 NA 50 NA NA NA <br />-Ripper attachment : NA NA 25 NA NA NA <br />OwnerhipcosUhour: $60.47 NA $46.49 NA NA NA <br />Operatingcost/hour: $123.05 NA $29.00 NA NA NA <br />Ripper ap. costlhour : NA NA $0.00 NA NA NA <br />Operatorcosf/hour: $32.96 NA $3278 NA NA NA <br />Unit subtotals : $216.48 NA $108.27 NA NA NA <br />Number of units : 4 0 1 0 0 0 <br />Group subtotals : Work : $865.93 Support : $108.27 Maintenance : $0.00 <br />Total work team cost/hour : 5974.20 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 96,800 BCY factor : 1.250 volume : 121,000 LCY <br />Source of quantity take-off : EXHl81T L <br />Source of estimated swell factor :EXHIBIT L <br />PermiUjob # : M-1986015 <br />Abbreviation :none <br />Filename : M015-002 <br />