Laserfiche WebLink
TETRA TECH RMC <br />Mr. Jeff Gregg <br />January 28, 2003 <br />Page 5 <br />resultant factor of safety was 1.6 without the surcharge and 1.9 with the surcharge (identical <br />to that found at Phase 5 above). <br />Phase 8 -Phase 8 will be surrounded by a slurry wall on all sides, except for the east near the <br />Cole Ditch. The slurry wall scenario modeled was based on drilling information in the <br />southwest comer of Phase 8. The profile modeled consisted of eight feet of overburden clay <br />overlying 34 feet of sand and gravel on top of claystone. The slurry wall was setback 50 feet <br />from the mine highwall and the Godding Hollow Ditch was 25 feet from the slurry wall. The <br />factor of safety was 1.8 without the surcharge and 2.0 with the surcharge. For the east <br />boundary of Phase 8, we modeled eight feet of overburden clay over 30 feet of sand and <br />gravel on top of claystone. The concrete lined, Cole Ditch was setback 65 feet from the <br />highwall. The resulting factor of safety was 1.5 with the surcharge and 1.7 without the <br />surcharge. <br />Phase 9 -Phase 9 will be enclosed on all sides by a slurry wall, with the exception of the <br />west side near the Cole Ditch. The Cole Ditch also applies to the east side of Phase 8 (factors <br />of safety of 1.5 and 1.7 above). The most critical slurry wall section in Phase 9 is in the <br />southwest corner. For this analysis, we modeled 12 feet of overburden clay overlying 30 feet <br />of sand and gravel on top of claystone. The slurry wall setback 50 feet from the highwall, the <br />relocated McCormick Ditch was setback 25 feet from the slurry wall, and the ground surface <br />was sloped upward to the south. The factor of safety at the ditch was 1.5 without the <br />surcharge and 1.9 with the surchazge. <br />Stability analyses were mn on 100 randomly generated circles generated at the mine excavation and <br />highwall, as well as the nearby permanent structure. The Simplified Bishop Method was used to <br />estimate the factor of safety on the most critical surface. Input files and graphic profiles of each <br />analysis are attached. <br />The mine plan incorporates minimum setbacks which are accounted for in our stability analysis. <br />Based on our analysis, mining should not pose a hazard to nearby permanent structures. <br />LIMIATIONS <br />Our review is based on regional geologic mapping, present mining plans, bore hole data, and stability <br />analyses using typical soil strength pazameters. Should the mining plans change or subsurface <br />conditions vary from those portrayed in this letter, we should be contacted in order to re-evaluate the <br />potential affects on man-made structures. <br />