My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-01-30_REVISION - M1998013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998013
>
2003-01-30_REVISION - M1998013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:53:35 PM
Creation date
11/21/2007 7:13:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Revision
Doc Date
1/30/2003
Doc Name
Adequacy Review Response
From
Tetra Tec RMC
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Shores Resource -Amendment No. 1 <br />Table for Reclamation Cost Estimate <br />Activity Quantity Units Unit Costs Cost <br />A. Phase 8 - 95% mined -approximately 60 acres of <br />disturbance. Fill sideslopes of pond with overburden <br />material and shape, seed and mulch shoreline - <br />approximately 6880 if perimeter distance at limit of <br />mining - 66001E at reclamation <br />1 Replace fill material using overburden and shape pond <br />side slopes at 3:1 223,901 CY $ 0.75 $ 167,926.00 <br />2 Replace overburden and shape the shoreline @ 4:1 12,222 CY $ 0.75 $ 9,166.67 <br />3 Replace 12" of topsoil on the shoreline @ 4:1 5,040 CY $ 0.75 $ 3,780.33 <br />4 Seed and mulch shoreline 3.1 Acres $ 800.00 $ 2,499.39 <br />Subtotal $ 183,372.39 <br />B. Dewa[ering trench would be excavated to nearly the <br />pond bottom elevation and f II with water ----- ----- ----- ---- <br />=; ~,: Subtotal --'-- <br />C. Phase 7 -Would be 100% reclaimed _____ _____ _____ _____ <br />_ _ Subtoia] ----- <br />D. Processing area. Processing equipment is portable and <br />would be removed by the operator <br />1 Move serge piles into settling pond 1,000 CY $ 0.75 $ 750.00 <br />2 Remove concrete pad for wash plant 15 CY $ 65.00 $ 975.00 <br />3 Remove concrete pad for asphalt plant 60 CY $ 65.00 $ 3,900.00 <br />4 Remove concrete pad for concrete plant 37 CY $ 65.00 $ 2,405.00 <br />5 Demolish and remove shop I LS $ 2,000.00 $ 2,000.00 <br />6 Remove concrete footings for office 8 CY $ 65.00 $ 520.00 <br />7 Remove concrete base for scale 10 CY $ 65.00 $ 650.00 <br />8 Scarify ground 25 Acres $ 150.00 $ 3,750.00 <br />9 Spread 12" topsoil 8,067 CY $ 0.75 $ 6,050.00 <br />10 Seed and Mulch 25 Acres $ 800.00 $ 20,000.00 <br />Subtotal . $ 10,030.00 <br />E. Settling Ponds <br />1 Place 12" overburden on 0.25 acre 403 CY $ 0.75 $ 302.50 <br />2 Place 12" topsoil on 0.25 acre 403 CY $ 0.75 $ 302.50 <br />3 Seed and Mulch 0.25 Acres $ 800.00 $ 200.00 <br />Subtotal $ 41,000.00 <br />F Slurry Wall @ 20% Installation Cost per DMG <br />Bonding Requirment. Assuming a total of 19,893 If of <br />wall, avg depth of 26.5' + 3' into bedrock <br />I Excavation, Materials and Labor and Dewa[ering 117,369 Face Ft $ 3.00 $ 352,106.10 <br />Subtotal $ 352,106.10 <br />Tota] Disturbance Costs $ 576,478.49 <br />Contractor Mobilization (8%) $ 46, I t 8.28 <br />Overhead (18.5%) $ 106,648.52 <br />Administration (5%) $ 28,823.92 <br />Total $ 758,069.22 <br />* Assumes 19893 linear feet, average depth 26.5' (+ 3' into bedrock) n 20% <br />Revised 1.28.03 Per Mining Plan Revisions <br />HALL-IRWIN CORPORATION -THE SHORES AMENDMENT 1 (#M-1998-013) Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.