My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-09-01_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1999-09-01_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:39 AM
Creation date
11/21/2007 7:07:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
9/1/1999
Doc Name
SURFACE MINE RECLAMATION COST ESTIMATE BATTLE MTN RESOURCES INC SAN LUIS MINE
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• Haul distances vary from 500 feet to 2,000 feet <br />• An average one-way haul distance of 1,400 feet is assumed <br />• Total resistance (grade and rolling) is 8% <br />Cycle time: Loaded 3.75 minutes Empty 2.5 minutes <br />Total cycle time = 6.25 minutes (grade adjusted) <br />• Haulage volume 20 yd3/load <br />• Unadjusted production rate <br />60 minutes hour / 6.25 minutes/load (20 yd3/load) = 192 yd3/load <br />• Production rate adjustments for 0.83 job efficiency and 0.92 operating altitude <br />192 yd3/hour (0.83) (0.92) = 146 yd3/hour <br />• Scraper time required per acre = (2,420 yd3/acre / 146 yd3/hour) = 16.5 hours <br />• Total estimated cost = 16.5 hours ($140/hour)=$2,310/acre <br />~~~[ ff/~~ <br />A.3 Topsoil Grading <br />Topsoil grading using a D-8N tracked dozer with a U type blade will require: <br />• Average push distance 50 feet <br />• Production rate 1,400 yd3/hour <br />• Job efficiency is 0.83 <br />• Slope adjustment for 10% is 1.2 <br />• No attitude adjustment is necessary <br />• Operator efficiency (average) is 75% <br />• Material type adjustment (loose-stockpile) is 1.2 <br />• Weight correction factor -soil 1.0 (i.e., soil weight estimated to be <br />2,300 Ibs/yd3 the D-8N has a rated capacity of 2,30016s/yd3) <br />Weight correction factor = 2,3001bs/yd3 / 2,300 lbs/yd3 = 1.0 <br />• Adjusted production rate <br />1400 yd3/hr (0.83)(1.2)(.75)(1.2)(1)=1,255 yd3/hour <br />• Dozer time required per acre = (2,420 yd3 / 1,255 yd3/hour) = 1.9 hours <br />• Total estimated cost = 1.9 hours ($135/hour) _ $257/acre <br />13~1~ <br />A.4 Waste Rock Contouring (Outslope Grading) <br />Waste rock contouring using a D-8N tracked dozer with a U type blade will <br />require: <br />Average push distance 100 feet <br />• Production rate 900 yd3/hour (unadjusted) <br />• Production rate adjustments for 0.83 job efficiency <br />• Slope adjustment for 30% is 1.8 (3H: I V slopes) <br />• No altitude adjustment is necessary <br />• Operator efficiency (average) is 75% <br />• Material type adjustment (loose stockpile) is 1.2 <br />PRELIMINARY DRAFT <br />FOR DISCUSSION PURPOSES ONLY <br />
The URL can be used to link to this page
Your browser does not support the video tag.