Laserfiche WebLink
<br /> <br />DAILY REPORT <br />PROJECT NAME: SAN LUIS MINE <br />REPORT DATE: 4/13/97 <br />PROJECT NUMBER: 92401.00 <br />T0: DAVE HALLMAN, SRK PROJECT ENGINEER <br />FROM: GLENN GUYER, SRK SENIOR FIELD TECHNICIAN <br />SUBJECT: LINER REPAIR AND EQUIPMENT EXTRACTION FROM TAILINGS <br />IMPOUNDMENT. <br />I received a telephone call from the liner contractor informing <br />me that they would have 40 mil HDPE liner on the site in the A.M. <br />and that welding rod would arrive in the P.M. I felt that we <br />could position the first sheet of liner adjacent to the old liner <br />after which we could place the second sheet and weld the liner <br />into position with a wedge welder, 40 mil HDPE to 40 mil HDPE. <br />I left for Fort Garland in the P.M. <br />~t <br />GLENN SRK F' d epresentative <br />DALY413.WP6 <br />