My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-04-07_REVISION - M1988112 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1997-04-07_REVISION - M1988112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 6:59:56 AM
Creation date
11/21/2007 7:02:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/7/1997
Doc Name
DAILY REPORT
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />DAILY REPORT <br />PROJECT NAME: SAN LUIS MINE <br />REPORT DATE: 4/13/97 <br />PROJECT NUMBER: 92401.00 <br />T0: DAVE HALLMAN, SRK PROJECT ENGINEER <br />FROM: GLENN GUYER, SRK SENIOR FIELD TECHNICIAN <br />SUBJECT: LINER REPAIR AND EQUIPMENT EXTRACTION FROM TAILINGS <br />IMPOUNDMENT. <br />I received a telephone call from the liner contractor informing <br />me that they would have 40 mil HDPE liner on the site in the A.M. <br />and that welding rod would arrive in the P.M. I felt that we <br />could position the first sheet of liner adjacent to the old liner <br />after which we could place the second sheet and weld the liner <br />into position with a wedge welder, 40 mil HDPE to 40 mil HDPE. <br />I left for Fort Garland in the P.M. <br />~t <br />GLENN SRK F' d epresentative <br />DALY413.WP6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.