My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-04-07_REVISION - M1988112 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1997-04-07_REVISION - M1988112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 6:59:56 AM
Creation date
11/21/2007 7:02:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/7/1997
Doc Name
DAILY REPORT
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DAILY REPORT <br />r <br />PROJECT NAME: SAN LUIS MINE PROJECT NUMHER: 92401.00 <br />REPORT DATE: 4/18/97 <br />T0: DAVE HALLMAN, SRK PROJECT ENGINEER <br />FROM: GLENN GUYER, SRK SENIOR FIELD TECHNICIAN <br />SUBJECT: LINER REPAIR <br />I arrived at the site at 0800 hrs. The earth moving contractor <br />used a D-SM (CAT) dozer to place liner cover material over the <br />repaired liner. An anchor trench was constructed, at surveyed <br />elevation 8614.5-ft, and the liner was anchored permanently and <br />covered. The elevation of the tailings surveyed adjacent to the <br />repaired area was 8611.2-ft. The surveyed co-ordinates of the <br />patched area was between north 207065 and east 2040498, on the <br />north, and north 206952 and east 2040439 on the south. I left the <br />site at 1100 hrs. and traveled to the SRK Lakewood office. <br />GLENN R, S ~i ld Representative <br />DALY418.WP6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.