Laserfiche WebLink
<br />DAILY REPORT <br />r <br />PROJECT NAME: SAN LUIS MINE PROJECT NUMHER: 92401.00 <br />REPORT DATE: 4/18/97 <br />T0: DAVE HALLMAN, SRK PROJECT ENGINEER <br />FROM: GLENN GUYER, SRK SENIOR FIELD TECHNICIAN <br />SUBJECT: LINER REPAIR <br />I arrived at the site at 0800 hrs. The earth moving contractor <br />used a D-SM (CAT) dozer to place liner cover material over the <br />repaired liner. An anchor trench was constructed, at surveyed <br />elevation 8614.5-ft, and the liner was anchored permanently and <br />covered. The elevation of the tailings surveyed adjacent to the <br />repaired area was 8611.2-ft. The surveyed co-ordinates of the <br />patched area was between north 207065 and east 2040498, on the <br />north, and north 206952 and east 2040439 on the south. I left the <br />site at 1100 hrs. and traveled to the SRK Lakewood office. <br />GLENN R, S ~i ld Representative <br />DALY418.WP6 <br />