Laserfiche WebLink
i <br />DAILY REPORT <br />• <br />PROJECT NAME: SAN LUIS MINE PROJECT NUMBER. 92401.00 <br />REPORT DATE: 4/15/97 <br />TO: DAVE HALLMAN, SRK PROJECT ENGINEER <br />FROM: GLENN GUYER, SRK SENIOR FIELD TECHNICIAN <br />SUBJECT: LINER REPAIR <br />I arived at the site at 0800 hrs. I observed air pressure test of <br />the two panels wedge welded yesterday consisting of 40 rnil HDPE <br />liner. All tests were done to the SRK project specifications. All <br />areas marked for repairs including 'T' joints were patched using <br />a Leister in place. <br />The welding rod received yesterday was not VLDPS but LLI)PE. The <br />company which had sent the wrong rod corrected their mistake by <br />shipping VLDPE which should arrive tomorrow. <br />GLE ER, I F ld Representative <br />DALY415.WP6 <br />