Laserfiche WebLink
PERMIT APPLICATION <br />REGULAR 112 (AMMENDMENT) <br />EXHIBIT L <br />Reclamation Costs <br />Pit and affected land reclamation costs aze based on the following. <br />Grade slopes 3 feet horizontal to 1 foot vertical: <br />10 hrs - 15t bulldozer @ 90.00 = 900.00 <br />Place 1 foot topsoil down over graded slopes: <br />12 hrs -15t bulldozer @ 90.00 = 1080.00 <br />Misc. grading. <br />10 hrs - 15t bulldozer @ 90.00 = 900.00 <br />Seeding, mulching and irrigating = 3500.00 <br />Mobilization <br />Seed, mulch, labor and bulldozer = 2000.00 <br />8380.00 <br />x 18% <br />9888.40 <br />Not more dean five acres per yeaz, during the life of the pit, will it be subject or exposed for <br />reclamation procedures. The pit (lake) excavation and reclamation will be a phased process <br />as described in Exhibits D & E. <br />