My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-05-25_REVISION - M1997014
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997014
>
2004-05-25_REVISION - M1997014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:44 AM
Creation date
11/21/2007 6:53:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997014
IBM Index Class Name
Revision
Doc Date
5/25/2004
Doc Name
Cost Summary Form
From
DMG
To
Aggregate Industries
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES.Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task x 005 State :Coronado PermiVjobp :M-1997.014 <br />Data. 05r15?004 Counry:Jellerson Abbrevlatfon:norro <br />User JDi Site:DeorCreckOuar ry FJenamo:MUi4-0OS <br />Agana or organization name : DMG <br />Parma err other lob action : 20z+cre phased rrn;lrrmnhun <br />rack dascnption regrade bench 1 /fines stockpJle <br /> <br />HOURLY EQUIPMENT COST <br /> Bas+c macr:ine L'at D8F Senc;; ll - 8U Horsepower : 310 <br /> Blade type :Uni versal <br /> Attachment no. 1 . BOPS Ceb Shift basis : 1 per day <br /> Attachment rw, 2 : NA <br /> Data source : (CRG) <br /> Utilization °b <br />Cost Breakdgwn : Ownership cosUhour : 544.07 NA <br /> Operating cosb'hour : 569.76 100 <br /> Ripper op. wsMour : 50.00 NA <br /> Operator costlhour 537.83 NA <br /> Total unit cosbtwur : S 145.66 Total gear oosUhour : f 145.66 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 22.600 CCY factor : 1.135 volume : 25,651 LCY <br />Source of eshmaled volume calcufafiavi <br />Sr:u«;o ui astimated swell lactorproyram <br /> <br />HOURLY PRODUCTION Joh_GonQitjon ConecU-gn F~ Spurco <br /> Operator shill : 0.75 (avg.J <br />Average push d+stanw : 100 feet Matanai consistency : 1.10 (Cef Hi3) <br />Unadjusted howdy production : 931 ti LCY/hr Donng method : 1.20 (slop <br /> visibility : 1.00 (avg.) <br />Material corulstency descnption Job efficiency : 0.83 (ishifrydayJ <br />Porty consokdated sfockpllo Spell pile : 0.80 1 (fid-rf) <br /> Push gradient : 700 I (Cat HB) <br />Average push gradient : 0.00 % (rrog) Altitude : 1.00 ~ (Caf HB) <br />Average silo altitude : 6,500 feel Material weight : 0.85 (Cat l (8) <br /> Blade typo : t 00 (S/SU/U) <br />Material weight 2, 7t)D IbsILCY Not correction : 0.56 <br />Weight descnption <br />Earth - Wof orcavefed Adjusted unit production r;zu ~+:i LCY/hr <br /> Adjusted gaol pmducLon : 520.93 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Oozor(s) Total lob time : 49.24 Hours <br />Unh cast : SO 280 /LCV Total lob cost : 37,173 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.