My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-05-25_REVISION - M1997014
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997014
>
2004-05-25_REVISION - M1997014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:44 AM
Creation date
11/21/2007 6:53:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997014
IBM Index Class Name
Revision
Doc Date
5/25/2004
Doc Name
Cost Summary Form
From
DMG
To
Aggregate Industries
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating S oftware <br /> BULLDOZER WOR K <br />PROJECT IDENTIFICATION <br />Task # 012 State . Cok;rrdo PernuUjob# :M-1997-014 <br />Datc : U525r1004 County :Jollorson Abbrevfaban :nwro <br />User : JU 1 Sito :Deer Crank Quarry Filename : M074-012 <br />Agency or organlzahon name UtifC <br />Permd or other job action ~.70,r:n~ pn,u~~d rec lor;atnn <br />task dosaipuro, push topsoil onto benches and slopes <br /> <br /> <br />HOURLY EQUIPMENT COST <br /> Basic machine Cat U8R Series 17 - 8U Horsepower : 310 <br /> Bladolype :Universal <br /> Attachment no. 1 : RODS Cab Shift basis : 1 per day <br /> Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Uti/tratfon °k <br />Cost Breakdown : Ownership costltaur : 544.07 NA <br /> Oparnting cosutqur : 569.78 700 <br /> Rlppor op. cosulwur : SO 00 NA <br /> Operator cosu7wur 537.83 NA <br /> Total unit cosuhour : S 145.66 Total goof cost/hour 5145.66 <br /> <br />MATERIAL QUANTITIES <br />In~ual Swell Loose <br />volume: 35.000 CCY lector: 1215 volume 42,525 LCV <br />Source of estimated volume : cakrdafbn <br />Average push distance : 100 teal Matenal consistency L f0 (Caf HB) <br />Unadjusted howdy production : 93f.8 LCV+hr Dozing method 1.20 (slop <br /> Visibility f.Op (avg.) <br />~ <br />Malarial wnslatency description : Job officrancy : 0.83 (1 shdf/day) <br />Pertly carsolidetod stockpile Spell pile : 0.80 (Intl-rp <br /> Push gradient : 7.00 (Caf HB) <br />Average push gradient : 0.00 % (nog) Altitude : 1.00 (Caf Hf3) <br />Average silo altitude : 6.500 lest Matodal weight : 7.44 (Cat HB) <br /> Blade type : _ f 00 _ (S/SU/U) <br />Material weight : 1,600 IbsILCY Nel corteclion : 0.94 <br />Weight descriptron <br />Top Sod Adjusted and production : ?i79 Uo LCY/hr <br /> Adjusted Ilrol protluction : 879-06 I. CYihr <br />JOB TIME AND <br />T <br />COS <br />Fteet size : 1 Dozers) Total job time 48.38 Hours <br />Und wst : 50.768 ILCY Total job cost : 57,046 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.