Laserfiche WebLink
HOURLY PRODUCTION shoot 2 of 2 <br />Haullna Caaacttv <br />Scraper Payload (weighq Bass . Scrapor Bowl (volumo) Basis <br />Material weight ~ 1,600 pounds/LCV Struck volume : 1.1.00 LCY <br />Material descnpt~on Heaped volumo : 20.00 LCY <br />Top Soif Average volume : 17.00 LCY <br />Rated payloa4 : 4B,OW pounds Adjustod capacity : 17.00 LCY "' <br />Paybad CapaClty : 70.00 LCV ••• !puny p.,xh,rtibn ,enc.ay o~ un,e per wepa ;~~ ~ on t ~,.n ~,~ inplNx <br />Cvela Tlmrf: Job Condition Correetions • Site a11i1udo (ft.) : 6.SU0 <br /> Scraper Push doter Source <br />Screper loading lima' : 0.50 minutes Altitude adl.: 1 000 L000 _ <br />(Cat HLf) <br />Manouver and spread time : 0, 70 minutes Job efficiency : 0.830 0.830 f Cerf H6) <br />' wnd r'rne om x'a~ v~~~ ~~ w+~ v~~i mn~AaU Nat aorrectlon 0 830 1 0.830 <br />T~gl time <br />Road condition descdplion ;Rutted dirt, hftla marnlenance, nu w.rter, 2" Bre ponetmM1on <br />Nnules <br />rretum route <br />I 1.200 -6.00 5.00 0.00 2942 <br />• - 0.54 <br />_ <br />"°"vau'"ef°r°xr"ep"'°"'+"'qu"r°arare~ereno'wfxslaraeor, Ratumtlme: 0.54 minutes <br />rebb xMDGeee f!ro mm. atta~roble par Wlal ,allsant0 ahoern, not ave,a(In <br />Total scraper loam cycle time (load • haul + maneuvor and spread + return) 3.38 minutes <br />Unadjusted unit production/hour ~ 301.Bt LCY/hour "' Adjustod forjob conditions 250.51 LCYRtour <br />Optimal number of ecrepers per push dolor : 3 Selecbd number of scrapors 3 screpor(s) <br />Adjusted single scraper roam (unit) howdy production : 751 fi7 LCYihour <br />Adjusted multiple scraper foam (Boat) hourly production 751.52 LCY/hour <br />JOB TIME AND COST <br />Fleet sire . f Team(s) Total job time 18.59 Hours <br />Unit cost : 50.788 ILCY Total job cost 511,012 <br /> <br />