Laserfiche WebLink
To: Erica Crosby <br />From: Jim Striggow <br />Re: Stone Wholesale, Inc. M-1997-065 conversion bond `~ <br />Date: 10-7-2007 <br />Erica: <br />CPJ -D I <br />RECE ~~ ~~ C <br />OCT 0 9 2007 / <br />plvislon Ota d Safety n. <br />Mining <br />In response to your letter dated 9-27-2007 I have decided to request a reduction in the <br />reclamation bond. After looking closely and discussing the stock/overburden/topsoil piles <br />with my hole foreman, we have determined that at least one half of the material in the <br />large pile farthest east is usable and in demand. We will grisly the material after we <br />extract the lazge pieces so even the smaller material can be used for veneer or be crushed <br />for decorative gravel. No part of this pile is topsoil as it was stripped first and stock piled <br />over by the bridge to the west. <br />The material in the pile close to the bridge consists of rubble, shale and topsoil. The <br />_ _ _ material. was-moved there indistinct steps. so consequently the topsoil-is on-the bottom; <br />the shale is in the middle and the rubble is on the top. We intend to process the top rubble <br />layer into crushed decorative rock this winter. The three layers aze in close to equal <br />proportions so one third of that pile is product so it too should not be part of the <br />reclamation bond. <br />Thank you <br />Jim Striggow President <br />Stone Wholesale, Inc. <br />• <br />R O C K 5 0 L I D E X C E L L E N C E <br />~.e'? <br />~IM SreleeoW PiesroerrT v <br />t~585 ~a ~i 7`'„P~ 1' z ~~"~,: ~`i pl°, f~`a,F'~'i~iP f T~ <br />I:CA <br />