My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-01-05_REVISION - M1985212
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985212
>
1994-01-05_REVISION - M1985212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2021 5:53:04 PM
Creation date
11/21/2007 6:51:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985212
IBM Index Class Name
Revision
Doc Date
1/5/1994
Doc Name
REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Type & Sequence
AM2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> -4- <br /> Notice Requirements <br /> Immediately after the first publication of your notice in a newspaper f general <br /> circulation in the locality of your proposed mining operation, you musi mail a copy of <br /> the notice to all owners of record of surface rights to the affected ]End and all owners <br /> of record of lands that are within 200 feet of the boundary of the affected land. <br /> Notice requirements are specified in Rule 2.2. A copy of a form which includes all <br /> required information for the notice has been attached for your use. You will need to <br /> provide the Division proof of notice prior to the decision date, which may be by <br /> submitting return receipts of a certified mailing or by proof of perso al service <br /> (Rule 2.2.2(6)) . <br /> NOTE TO COMMENTORS/OBJECTORS: It is likely there will be additions, c anges , and <br /> deletions to this document prior to final decision by the Mined Land R clamation Board <br /> or Division. Therefore, if you have any comments or concerns, you sho ld contact the <br /> applicant or the Division prior to the decision date so that you will now what changes <br /> may have been made to the application document. <br /> The Division is not allowed to consider comments, unless they are writ en, and received <br /> prior to the end of the public comment period. You should contact the applicant for the <br /> final date of the public comment period. <br /> If you have questions about the Mined Land Reclamation Board and Divis on' s review and <br /> decision or hearing process, you should contact the Division at (303) 66-3567. <br /> As an authorized representative of the applicant. I hereby certify tha the operation <br /> described herein has met the minimum requirements of the following ter s and conditions: <br /> 1 . This mining operation will not adversely affect the stabili y of any <br /> significant, valuable and permanent man-made structures) -located within two <br /> hundred (200) fee of the affected lands. However, where there is an agreement that <br /> damage to the structure is be be compensated for by the applicant operator (C.R.S. <br /> 34-32-115(4)(d)) , then mining may occur within 200 feet. Proof o an agreement <br /> must be submitted to the Division prior to the decision date. <br /> 2. No mining operation will be located on lands where such ope ations are <br /> prohibited by law (C.R.S. 34-32-115(4)(f)) ; <br /> 3. As the applicant/operator, I do not have any mining/prospec ing operations in <br /> the State of Colorado currently in violation of the provisions of the Mined Land <br /> Reclamation Act (C.R.S. 34-32-120) as determined through a Board finding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.