Laserfiche WebLink
~(~I~~Z-v~~ ~~ •C~3iu <br />DMG Comments from on-site meeting of Aprfl 11, 2006 I ~~ ~ ~~ <br />Bayshore Project ~/ <br />Jodi Villa, P.E. SI•~ V ~ t ~- - 1~,,~ <br />Meurer & Associates <br />G~~SGc~.ise~ y/ r y/Dl~ <br />1. Prepare groundwater model to address how slurry wall affects creeks, runoff, re- f f O.L . <br />charge and mountinglshadowing affects on and around site. /v ~~-d <br />To :DCb- <br />2. Obtain letters From the affect utility agencies (in this case water, gas, sewer) stalina~ <br />That Carma will be responsible for any damage to the utilities as a result of the ~,. MFG <br />reclamation of the ponds- <br />3. Revise seed mix. Will you please send me your recommendation? ~V~~f~ <br />4. Obtain a letter from current operator authorizing Meurer 8 Associates to negotiate <br />with the DMG for the DMG permit amendment <br />5. Consider revising the slurry design. Will you please direct me to where I can get <br />v your recommendation? <br />v 6. Address pond edge slopes. Please direct me to your requirements. <br />7 Revise slurry wall height listed in application. <br />8. Provide more information on location and source of borrow. <br />9. Address 100-year flood and haw water will enter and exit the ponds. <br />10. Provide vegetative cover/soils maps. Did you need both the soils and the <br />vegetative? I believe the soils was in the orginal permit. <br />11. Provide a list of wells within 600 feet of the permit area. This comment was from <br />the State. <br />htouror R Assoaates~ <br />Panted 4!14+06 -~ <br />C:lpocumenls and Sottings~deglt.ocal SeHingsUamporary Intomet FIIOSIOLKAtOMG t;ommants Irum unsAC~ <br />mlg.do~~ <br /> <br />