Laserfiche WebLink
winter of 2002/2003 and into the summer of 2003. System performance will be evaluated for <br />both winter and summer conditions. Should testing of pilot system indicate favorable results, <br />GSHI may propose construction of a full-scale system during the summer of 2003. Such <br />activities will be proposed in future technical revisions. <br />l2 <br />