My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-10-20_REVISION - M1977522
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977522
>
2005-10-20_REVISION - M1977522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:23:37 PM
Creation date
11/21/2007 6:39:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977522
IBM Index Class Name
Revision
Doc Date
10/20/2005
Doc Name
Succession of Operators Application Package
From
Star Ready Mix
To
DMG
Type & Sequence
SO2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-2- <br />Upon submittal of this application, the application fee, and the replacement performance and financial warranties the Division <br />will transfer the permit to the Successor Operator. After the transfer is complete the Division will then review the reclamation <br />costs of the permitted operation. The Successor Operator will be notified, if additional reclamation bond is required, within <br />60 days of approval if you do not wave your right to a decision within 30 days. The Division will notify both operators upon <br />completion of the permit transfer. <br />Anulication Review Procedures <br />The Division must act upon your application within thirty (30) days of receipt. <br />The Division will grant your request for a permit transfer if it finds that the successor operator is capable of assuming all <br />responsibility for the conditions included under the original permit by virture of acceptable performance and financial <br />warranties. Your request is automatically approved if it has not been denied by the Division within thirty (30) days of filing. <br />If the Permit Transfer application is denied, you will be notified within ten (10} days of the decision deadline. You may appeal <br />the Division decision to the Mined Land Reclamation Board by submitting a written Request for Administrative Appeal to the <br />Board within sixty (60) days of the date of the decision (please refer to C.RS. 34-32-107 (Hazd Rock Statutes), and <br />C.RS. 34-32.5-107 (Construction Material Rules and Regulations) and C RS. 4-4-104(9)}. <br />Notice of Permit Transfer is acknowledged in the monthly activity report attached to the monthly Boazd Agenda. <br />Once the Permit Transfer document is approved, the originally submitted Performance and Financial Warranties will be <br />returned to the previous operator, as the previous operator is no longer responsible for the reclamation of the transferred <br />operation. <br />NOTICE TO SUCCESSOR OPERATOR: <br />1) Once the Permit Transfer is approved, you will be responsible for maintaining the mining and reclamation operations <br />in compliance with the Mined Land Reclamation Act and the Mineral Rules and Regulations for Hazd Rock, Metal <br />and Designated Mining Operations or the Colorado Land Reclamation Act for the Extraction of Construction <br />Materials and the Construction Material Rules and Regulations. <br />2) All of the application materials, as amended and supplemented, are an integral part of the permit. They have been <br />incorporated into the permit by reference. We suggest you keep a copy of the pemrit, the permit application, and a <br />copy of the regulations at the mining operation as a reference. If you aze unable to secure a copy of the permit <br />application from the original operator, you may purchase a copy from the Division. <br />3) Changes in the mining and reclamation operations that differ from those described in the permit may require a <br />revision to the permit. We suggest consulting the Mineral Rules and Regulations orthe Construction Material Rules <br />and Regulations and/or contacting us to determine if a revision to the permit is necessary. Rule 1.8 and 1.10 pertains <br />to Amendments, Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />4) On your permit anniversary date each yeaz, you MUST submit an annual fee and report to the Division. Please <br />consult C.RS. 34-32-127(2) for Hazd Rock and Metal Mines or C.R S. 34-32.5-125 for all construction materials <br />operations for the applicable annual fee requirements for your operation. <br />M:~miuU3I)CLNINFORMSl3117F. WPF(Q4/28/2003) <br />
The URL can be used to link to this page
Your browser does not support the video tag.