Laserfiche WebLink
Corey Pit No. 3 <br />DMG 112 Permit Conversion Application <br />EXHIBTT L -Reclamation Costs <br />Earthwork: High-wall reduction 25 ft vertical to 3:1 slope x 800 ftlineal = 15625 cy <br />Avg distance = 50 ft, Cat D7G estimated at 700 cy/hr@ $225/hr = $5,022 <br />Grade 20 acres Cat 14H grader @ $112.91/hr x 1 ac/1u x 20 =$2,258 <br />Rip 20 acres Cat 14H grader @ $117.22/hr x 1 ac/hr x 20 =$2,344 <br />Replace overburden Cat 633E Series2 Scraper @$224.50/hr x <br />32,OOOcy/700 cy/hr for 400 foot avg haul = $10,263 <br />Replace topsoil Cat 633E Series2 Scraper @$224.50/hr x <br />32,OOOcy/700 cy/hr for 400 foot avg haul = $10,263 <br />Revegetate 50 acres x $500/acre = $25,000 <br />Mobilization 2 miles one way = $1.000 <br />Subtotal = $56,150 <br />Overhead and Profit Subtotal x 13% _ $ 7,300 <br />Total Contract = $63,450 <br />DMG Management 5% of Total Contract = $ 3.173 <br />Total Bond Amount = $66,623 <br />