Laserfiche WebLink
RECLAMATION COSTS <br />EXIIIBIT L <br />The worst case reclamation scenazio occurs at the conclusion of the mining of Stages A and B. At <br />this point [he amount of amount of material which will need to be moved to reclaim the Phases <br />will be the greatest at approximately 136,000 cubic yards. The topsoil berms which aze azound the <br />entire pit perimeter and temporary overburden stockpiles would have to be rehandled and <br />regraded into the mining slopes in order to bring the slopes to a 3H:1 V siope. All of the <br />equipment on site will be portable, so there will be no cost associated with removing these items. <br />The following table shows the reclamation costs for the worst case scenario. <br />Haldorson Sand and Gravel Mine 49 <br />