Laserfiche WebLink
ors ~ m~q ez3 ,M~i D~ <br />EXHIBIT D Reclamation Plan <br />RECEIVED <br />DEC 112006 <br />DiWsion of Reclamation, <br />Mining and Safety <br />Upon completion of the excavation, the newly affected portion of the pit walls will be sloped at a 3:1 or <br />flatter slope. <br />As the topsoil in the stockpile and existing plant site azea is minimal, reclamation will wnsist of scarifying <br />the area with a plow or disc, drilling the seed and then using a straw mulch crimped in place at a minimum <br />rate of 2 tons per acre. Seeding and fertilizer application rates will be determined as per NRCS attached <br />recommendations. <br />There will be no ponds or buildings remaining on-site as result of this operation. <br />Projected Reclamation Expense <br /> Hrs/ Rate Cost <br /> Acres <br />Dozer to level and grade slopes 10 $100 $700 <br />Haul in new top-soil to supplement existing 20 $50 $1000 <br />Push Top- Soil across azea for planting 4 $100 $ 400 <br />Grass Seed (acres& rate/ acre) 5.4 $50 $270 <br />Drilling Cost (acres & rate/ acre) 5.4 $20 $108 <br />Stitch straw as ground protection 5 $50 $250 <br />Estimated Reclamation expense 2728 <br />