My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-06-28_REVISION - M1983033
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983033
>
2002-06-28_REVISION - M1983033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:53 PM
Creation date
11/21/2007 6:29:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
Revision
Doc Date
6/28/2002
Doc Name
Adequacy Review Comments
From
DMG
To
Albert Frei & Sons Inc.
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lined Pi[ Guide 10 September 2000 <br />first excavating a trench with a flat floor and sloping sides around the perimeter of the reservoir at [he <br />midpoint of the wedge of soil liner fill that will be installed. Trench excavation continues until <br />impermeable material is penetrated to the depth listed in the specifications. The keyway is backfrlled <br />with soil liner fill that is compacted in accordance with the specifications. <br />Soil Liner Cover Fill <br />The design should describe the materials that will be used to bury the soil liner and the depth of burial <br />to prevent desiccation, freeze-thaw effects, and erosion. Typically, the wedge of soil liner fill may by <br />covered by several feet of random fill, and the reservoir perimeter protected from wave erosion by a <br />layer of pit run gravel or riprap depending on the size of the water surface and the anticipated wave <br />generation. <br />Specifications <br />The Division of Minerals and Geology does not require that Applicants provide the complete set of . <br />technical specifications for a soil liner project. However, certain elements of the specifications should <br />be incorporated into the reclamation permit to becpme eligible for the lower bond under the regulated <br />construction option. These elements are outlined in the following list of typical examples: <br />Submittals - Provide a basic earthwork operations plan and schedule for the installation of the soil <br />liner and the soil liner cover fill. Include a description of the equipment and quality control <br />procedures to be used, including lift thickness control, composite material prepazation, and methods <br />for moisture conditioning. <br />Materials -Soil liner and soil liner cover fill shall be free of organic matter, debris, frozen material, <br />and other deleterious materials. Soil liner fill shall be excavated from approved borrow areas and <br />conform to the following (example) specification: <br />U.S. Standazd <br />Percent Passing <br />Sieve Size by Drv Weieht <br />3/4-inch 100 <br />3/3-inch 70-100 <br />No. 4 50-100 <br />No. 40 20-50 <br />No. 200 20-50 <br />Plasticity Index 10 minimum <br />Excavations -Excavations shall be eraded and properly maintained to provide adequate drainage at <br />all times. Work shall be suspended when the site is overly wet, muddy, or otherwise unsuitable for <br />proper maintenance. In excavations where soil liner fill is to be placed on slopes steeper than <br />
The URL can be used to link to this page
Your browser does not support the video tag.