Laserfiche WebLink
-z- <br />Aoolicatlon Review Procedures <br />The Division must act upon your application within thirty (30) days of receipt. <br />The Division will grant your request for a pemri[ transfer if it finds that the successor operator is capable of assenting all <br />responsibility for the conditions included under the original permit by virtue of acceptable performance and furanciat warranties. <br />Your request is automatically approved if it has not been denied by the Division within thirty (30) days of filing. <br />If the Permit Transfer application is denied, you will be notified within ten (10) days of the decision deadline. You may appeal the <br />Division decision to the Mined Land Reclamation Board by submitting a written Request for Administrative Appeal to the Board <br />within sbcty (60) days of the date ofdte decision (please refer ro C.R.S. 3432-107 (Flard Rock Statutes), and C.R.S. 34-32.5-107 <br />(Construction Material Rules and Regulations) and CR.S. 4-4-104(9)). <br />Notice of Pemtit Transfer is aekaowledged in the monthly activity report attached to the montlily Board Agenda. <br />Once the Permit Transfer document is approved the originally submitted Performance and Financial W ar[anties will be retttmed ro <br />the previous operator, as the previous operator is no longer responsible for the reclamation of the transferred operation. <br />NOTICE TO SUCCESSOR OPERATOR: <br />1) Once the Pemtit Transfer is approved, you will be responsible for maintaining the mining and reclamation operations in <br />compliance with the Mined Land Reclamation Act and the Mineral Rules and Regulations for Hard Rock, Metal and <br />Designated Mining Operations or the Colorado Land Reclamation Act for the Exaaction of Construction Materials and <br />the Construction Material Rules and Regulations. <br />2) All of the application materials, as amended and supplemented, are an integral part of the permit. They have been <br />incorporated into the pemtit by reference. We suggest you keep a copy of the permit, the pemtit application, and a copy <br />of the regulations at the mining operation as a reference. If you are unable to secure a copy of the permit application <br />from the original operator, you may purebase a copy from the Division. <br />3) Changes in the mining and reclamation operations that differ from those described in the permit tray require a revision ro <br />the pemdt. We suggest wnsulting the Mineral Rules and Regulations or the Constntction Material Rules and <br />Regulations and/or contacting us to determine if a reviaioa to the permit is necessary. Rule 1.8 and 1.10 pertaivs ro <br />Amendments, Rule 1.9 to Technical Revisions, and Rule I.1 I to Conversions. <br />4) On your permit anniversary date each year, you MUST submit an annual fee and report to the Division. Please consul[ <br />C.R.S. 34-32-127(2) for Hazd Rock and Metal Mines orC.R.S. 34-32.5-125 for all construction materials operafions for <br />the applicable annual fee requirerttents for your operation. <br />M:~nvnshretvxfavmlTnnrfer Mi,ml Pmmt.Jac <br />tosmnooa] <br />