My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-02-12_REVISION - M1985043
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985043
>
1997-02-12_REVISION - M1985043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 12:27:15 PM
Creation date
11/21/2007 6:28:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985043
IBM Index Class Name
Revision
Doc Date
2/12/1997
Doc Name
CONSTRUCTION MATERIALS REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN <br /> This mining operation will mine from its current location north <br /> into "phase I" of the extension area. Plant sites will move <br /> sequentially from our present plant location north through "phase <br /> I" . Mining will be conducted so as to facilitate reclamation <br /> benches along the east side of the mining area. Topsoil will be <br /> stockpiled along the east side at the bottom of the benches . This <br /> topsoil will be placed on the benches to facilitate reclamation. <br /> Phase II mining will progress from east to west, while phase III <br /> and IV mining will progress from north to south. In all phases <br /> reclamation will be conducted simultaneously with mining. <br /> EXHIBIT D <br />
The URL can be used to link to this page
Your browser does not support the video tag.