Laserfiche WebLink
MINING PLAN <br /> This mining operation will mine from its current location north <br /> into "phase I" of the extension area. Plant sites will move <br /> sequentially from our present plant location north through "phase <br /> I" . Mining will be conducted so as to facilitate reclamation <br /> benches along the east side of the mining area. Topsoil will be <br /> stockpiled along the east side at the bottom of the benches . This <br /> topsoil will be placed on the benches to facilitate reclamation. <br /> Phase II mining will progress from east to west, while phase III <br /> and IV mining will progress from north to south. In all phases <br /> reclamation will be conducted simultaneously with mining. <br /> EXHIBIT D <br />