My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-12-14_REVISION - M1978056
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978056
>
2004-12-14_REVISION - M1978056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:52:08 PM
Creation date
11/21/2007 6:28:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
Revision
Doc Date
12/14/2004
Doc Name
Interim Flood Control Measures
From
Chris Pauley
To
Forrest Leaf
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORbER <br />Based on the foregoing findings of fact and conclusions of law, the Board hereby <br />approves the Section 112 Constmction Materials Amendment Application of Vana <br />Companies, Inc., Sle>}umber M-1978-056, subject to the following conditions: <br />The operator will cease any further addition of fill material within the designated <br />floodway of the Cache la Poudre River, unless authorized by. the designated local, state <br />and federal. flood control authorities, i.e. Weld County, Colorado Water Conservation <br />Board, and Federal Emergency Management Agency. The "addition of.fill material" <br />includes the addition of any earth materials that result in an increase in the height, width <br />or length of the existing flood control berm; <br />2. Any further modifications to the present configuration of the existing flood control berm <br />must be consistent with the laws or regulations of the designated local, state, and federal <br />flood control authorities, i.e. Weld County, Colorado Water Conservation Board, and <br />FEMA. <br />Designs and plans for future modifications to the present configuration of the existing <br />flood control benn must be prepared and signed by a registered professional engineer <br />with experience in floodway and floodplain hydraulics. <br />4. Tho operator will submit as-built designs signed by a registered professional engineer <br />with experience in floodway and floodplain hydraulics within 30 days of completion of <br />any modifications to the present configuration of the existing flood control berm; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.