Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION Permit/job# :M-1977-222 <br />Task # : 001 State :Colorado <br />Date : 07/2812003 County :Otero Abbreviation :none <br />User : JDf Site :Rocky Ford Soufh Pit Filename : M222-001 <br />Agency or organization name :DMG <br />Permit or otherjob action :Phased reclamation <br />Task description :Grade slopes to 3:1 <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R Series 11-7SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 : NA <br />Horsepower: 240 <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $34.53 NA <br />Operatingcost/hour : $43.70 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator costlhour : $24.01 NA <br />Total unitcost/hour : $102.24 Total Fleet cosUhour : x102.24 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 30,000 BCY factor : 1.250 volume : 37,500 LCY <br />Source of estimated volume :calculation <br />Source of estimated swell factor :program <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 714.3 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 15.00 % (r <br />Average site altitude : 4,350 feet <br />Material weight :_ <br />Weight description <br />Decomposed rock - 25 % Rock, 75% <br />2,650 4bsILCY <br />JOB TIME AND COST <br />Fleet size : 1 Dozer{s) <br />Unit cost : $0.208 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.20 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.33 <br />Altitude : 1.00 <br />Matedal weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.69 <br />Source <br />Adjusted unit production : 492.22 LCY(hr <br />Adjusted fleet production : 492.22 LCY/hr <br />Total job time : 76.19 Hours <br />Total job cost : x7,789 <br />