Laserfiche WebLink
SECTION CORNER OF 24/19/25/30 <br />Fnd No.6 REBAR W/ 2Y2" ALUMINUM <br />CAP IN MONUMENT BOX, LS 17662 <br />N 1381406.9892 <br />E 3155440.0146 <br />POINT ' <br />STA: 0 +00 LIZ <br />SET #6 REBAR <br />W/2 -1/2" ALUM. CAP <br />N 1381365.9439 STA: 0 +14.17 <br />E 31555551554 POINT 1 <br />DEPTH 30' <br />ELEV= 4908.49 <br />DATE I REV. <br />CP -GAS Set No.4 REBAR <br />W/ 13¢" ALUMINUM CAP <br />ELEVATION= 4808.62 <br />N 1381306.1982 <br />E 3155508.1248 <br />CP -TOP Set No.4 REBAR <br />W/ 112" ALUMINUM CAP <br />'ELEVATION= 4830.32 <br />N 1380799.3845 <br />E 3155409.9635 <br />TA: 2 +13.68 <br />POINT 2 <br />DEPTH = 42" <br />ELEV= 4806.86 <br />CP -GATE' Set No.4 REBAR <br />W/ 1Y2" ALUMINUM CAP <br />ELEVATION= 4806.90 <br />N 1381424.5869 <br />E 3156885.8649 <br />WELD COUNTY ROAD 54 <br />- _ - N89' TOTE (NORTH LINE NW 1/4 SEC. 30 BASIS OF BEARINGS) 2562.28' <br />STA: 4 +13.71 STA: 6 +13.59 <br />POINT 3 POINT 4 TA: 8 +12.75 <br />DEPTH 34" DEPTH =43" POINT 5 <br />ELEV = 4805.78 ELEV= 4805.70 DEPTH =42" <br />ELEV= 4806.72 <br />PI #1 <br />STA: 3 +18.76 <br />N 1381363.9606 <br />E 3155873.9093 <br />ELEV= 4806.13 <br />DELTA = 0'28'41 "LT <br />REFERENCE POINT <br />SET #6 REBAR W/ 2 -1/2" <br />ALUM. CAP 20.00' NORTH <br />OF PI #2 <br />STA: 10 +12.59 <br />TA: 12 +13.08 <br />TA: 14 +12.20 <br />TA: 16 +12 59 <br />TA: 18 +12.69 <br />POINT 6 <br />POINT 7 <br />POINT 8 <br />POINT 9 <br />POINT 10 <br />DEPTH= 41 <br />DEPTH =49" <br />DEPTH 37" <br />DEPTH 49" <br />DEPTH 65" <br />ELEV= 4806.56 <br />ELEV = 4805.61 <br />ELEV = 4804.69 <br />ELEV= 4803.03 <br />ELEV= 4802.11 <br />LINE I - 3't SOUTH OF EXISTING GAS LINE <br />LINE WAS POT HOLED AND DEPTH'S BELOW <br />EXISTING GRADE WERE MEASURED. <br />MONUMENTS WERE SET APPROXIMATELY 3' SOUTH <br />OF GAS LINE ON STRAIGHT LINES BETWEEN POINTS <br />INDICATED HEREON AS POINT "A ", PI #1, AND PI #2 <br />The purpose of this survey was to establish monuments to be used to monitor movement <br />of soil adjacent to existing gas lines along the north and east sides of the proposed <br />sand and gravel extraction areas. The depths and locations of the pipelines were <br />established by pot holing the lines on 200± intervals, this was done by Mayo Welding. <br />Once the pot holing was completed we set a #6 rebar the length of the depth of the <br />holes, a 2 -1/2" aluminum cap was placed on the top of each rebar with center punch <br />and stamped with the point number of each hole. We established elevations of each <br />monument, as noted hereon. Coordinates of the reference points and PI's set to control <br />the lines are based upon coordinates established during topographic surveys of the site. <br />Stations of the points represent the distances between the points. Future surveys of <br />these points will be made to assess movement of the soil. <br />DATE OF INITAL SURVEY - DURING THE MONTH OF MARCH, 2002 <br />SURVEYOR'S CERTIFICATE <br />I, Michael J. DeDecker, a duly registered land surveyor in the state of Colorado, do hereby <br />certify that this plat and the survey on which it is based was prepared by me or under my direct <br />su ervis'on and ocj�ctlur to to the best of my knowledge and belief. <br />MI AE J ^ ED C F�R P.LS. 20676 0' <br />Frond o behalf of ., <br />S Engineering Corporation, INC. <br />S <br />RECORD OF ISSUE <br />BY I CK. IAPP <br />MJD <br />DATE: JULY 15, 2002 <br />FIELD BOOK: LOVELAND READY -MIX <br />SCALE: 1- = 1Do- <br />PROPOSED AREA FOR GRAVEL <br />EXTRACTION <br />Engineering <br />Corporation <br />165 SW 2ND ST <br />LOVELAND COLORADO 80537 <br />(970) 667 -8010 <br />TA: 20 +12.13 <br />POINT 11 <br />DEPTH 62" <br />ELEV= 4802.59 <br />STA: 2 +09.91 <br />POINT 20 <br />DEPTH 47" <br />ELEV= 4801.33 <br />STA: 0+12.60 <br />POINT 19 <br />DEPTH 78" <br />ELEV= 4802.11 NORTH QUARTER SECTION 30, <br />_ _ .O-.- -- Fnd No.6 REBAR W/ 2Y2" <br />ALUMINUM CAP IN MONUMENT <br />BOX, LS 17662 <br />REFERENCE POINT N 1381407.7074 <br />SET #6 REBAR W/ 2 -1/2" E 3158002.2909 <br />ALUM. CAP 50.00' EAST OF <br />PI # 2 <br />PI # 2 <br />STA: 21 +66.35 <br />= 0 +2.0 LINE 2 <br />N 1381367.8801 <br />E 3157721.4930 <br />ELEV= 4801.77 <br />D= 82'44' 19" <br />TA: 4 +09.17 <br />POINT 21 <br />DEPTH 47" <br />ELEV = 4779.70 <br />STA: 6 +06.80 <br />POINT 22 <br />DEPTH 47" <br />ELEV= 4801.09 <br />PI # 3 <br />STA: 6 +30.24 <br />N 1380762.6991 <br />E 3157799.9076 <br />ELEV= 4801.77 <br />D= 3'55'37" LT <br />LINE 2 - 3't WEST OF EXISTING GAS LINE. <br />LINE WAS POT HOLED AND DEPTH'S BELOW <br />EXISTING GRADE WERE MEASURED. <br />MONUMENTS WERE SET APPROXIMATELY 3' SOUTH <br />OF GAS LINE ON STRAIGHT LINES BETWEEN POINTS <br />INDICATED HEREON AS POINT PI #2, AND PI #3, AND <br />POINT 26. <br />CLIENT: <br />LOVELAND READY -MIX CONCRETE, INC. <br />COS ENGINEERING CORPORATION <br />"Consulting Engineers and Professional Construction Managers" <br />CML / STRUCTURAL ENGINEERING. GEOTECHNICAL AND FOUNDATION ENGINEERS, <br />DAMS AND RESERVOIRS, LAND AND MUNICIPAL PLANNING, LAND AND CONSTRUCTION SURVEYS <br />SOILS / CONCRETE / ASPHALT TESTING AND FIELD INSPECTION <br />STA: 8 +18.74 <br />POINT 23 <br />QIDEPTH 42" <br />ELEV= 4800.72 <br />STA: 10 +18.05/ <br />POINT 24 <br />DEPTH 60" <br />ELEV= 4798.65 <br />STA: 12 +20.18 <br />POINT 25 <br />DEPTH 42" <br />ELEV= 4801.76 <br />STA 13 +56.37 <br />POINT 26 <br />DEPTH 44" <br />ELEV= 4801.64 <br />JIL <br />7 1 F <br />GRAPHIC SCALE <br />100 200 <br />( IN FEET ) <br />1 inch = 100 ft_ <br />A INDICATES SET 2 -1/2" ALUMINUM CAP ON <br />NUMBER 6 REBAR, LENGTH OF REBAR AT EACH <br />POINT IS THE DEPTH OF THE GAS <br />LINE ACCORDING TO THE POTHOLE DEPTH, <br />STA: 12 +13.08 - STATION INDICATES DISTANCE <br />FROM STA 0+00 <br />POINT 7 - INDICATES POINT NUMBER STAMPED ON <br />ALUMINUM CAP <br />DEPTH =49" - INDICATES DEPTH OF GAS LINE LINE <br />BELOW GROUND. <br />ELEV= 4805.61 - INDICATES ELEVATION OF ALUMINUM CAP <br />SET AS MONITORING POINT <br />Permit Confidental? <br />Class: Type-Seq.: <br />From: T W' <br />Doc. Name: <br />�� <br />Doc. Date (if no Gate stamp) <br />PROJECT TITLE: RECEIVED <br />GREEN /CROISSANT PROPERTY AUG 2 9 2002 <br />IN SEC. 30- T5N -R67W <br />Division of Minerals and GI <br />SHEET TITLE: <br />CONTROL LINES FOR PIPELINE MOVEMENT <br />PROJECT NO. <br />P02 -1783 <br />DRA111NG NO. <br />GAS LINE <br />MONITORING <br />RENSION NO. <br />SHEET <br />IO1 <br />