Laserfiche WebLink
CONSTRUCTION DRAWINGS FOR <br />CAi.[4L[Aai­ M- ML Fa[7 70 =30LEV GR EL E347 <br />Permit Number MIMI - eF 3- <br />Class: ❑ Pemit <br />Section/Exhibit: <br />! Class feVI Ion <br />!Types €v1J1 CP:L _.L� %(1,dLDC�G I o 9 J7-cal <br />- Class: O Report l7 Hydro 0 enerBV / <br />Doc Type: <br />17Application (Coal only) ❑ Bond O Enforcement O Inspection <br />[N T- IBRC0[V NIL C _07 [�`[[2,IBL[R1fE <br />CITY OF THORNTON PROJECT NUMBER 98 -15 <br />STATE OF COLORADO <br />LIST OF DRAWINGS <br />DRAWING <br />SHEET <br />NO. <br />NO. <br />00177-1 <br />1 <br />03177 -z <br />z <br />001773 <br />S <br />00177 -4 <br />4 <br />001775 <br />5 <br />00177-6 <br />6 <br />Wm -7 <br />T <br />00177 -6 <br />6 <br />00177 -9 <br />9 <br />TITLE <br />COVER SHEET AND DRAWING LIST <br />OVERALL PLAN, GENERAL SITE LAYOUT AND SURVEY CONTROL <br />PLAN AND PROFILE SOUTH END OF PIPELINE <br />PLAN AND PROFILE NORTH END OF PIPELINE <br />HANGING BAFFLE STILLING BASIN AND STRUCTURAL DETAILS <br />PIPE, SLUICE GATE, AND GATE VAULT DETAILS <br />MISCELLANEOUS DETAILS <br />TRAFFIC CONTROL PLAN AND SECTIONS <br />LEGEND, ABBREVIATIONS, AND STRUCTURAL NOTES <br />SITE LOCATION MAP <br />(NOT TO SCALE) <br />C.J. <br />ARRREVUTION <br />= CONSTRUCTION JOINT <br />C <br />= CENTERUNE <br />CUR. <br />= CLEAR <br />DM. <br />: DIAMETER <br />E <br />=EAST OR EASnNG <br />E.F. <br />= EACH FACE <br />E . <br />= ELEVATION <br />E0. SPC.= EQUALLY SPACED OR <br />TITLE: DATE <br />EQUAL SPACES <br />E.W. <br />- EACH WAY <br />1.0. <br />= INSIDE DIAMETER <br />N.H. <br />= MANHOUE <br />N <br />= NORTH OR NORTHING <br />O.C. <br />= ON CENTERS <br />VA. <br />= STATION <br />TINS <br />= TOP AND BOTTOM <br />T.O. <br />=TOP OF <br />P. <br />= tt %CA L <br />PREPARED FOR <br />City of Thornton <br />PREPARED BY <br />GEI Consultants, Inc. <br />ENGLEWOOD o COLORADO <br />"1 HEREBY AFFIRM THAT THESE PLANS WERE PREPARED BY ME <br />(OR UNDER MY DIRECT 5UPERMSI001) AND ARE TRUE AND CORRECT <br />TO THE BEST OF MY KNOWLEDGE." <br />ROBERT J. NUUAK, P.E. <br />GO CONSUL -ANTS, INC. <br />APPROVALS <br />91TY OF THORNTON <br />PROJECT MANAGER - MICHAEL J. GAT DATE <br />CITY ENGINEER - FRANK CASTELENATD DATE <br />UTIIJTIES OPERATION MANAGER - RAI MITCHELL GATE <br />AMS COUNT <br />COUNTY ENGINEER DATE <br />tl <br />RECORD DRAAINGS APPflOYED qT: <br />RECORD DRAWING INFORMATION <br />N <br />S <br />F <br />;iS <br />III <br />E <br />W�Q <br />P: <br />TITLE: DATE <br />C <br />W <br />Oa�o <br />�o <br />m <br />Uf <br />DcQi <br />CONTRACTOR <br />� U0 <br />CONTRACTOR SHALL FIELD LOCATE ALL ABOVE AND BELOW GROUND <br />U� <br />to,`c <br />ENGINEER (PROJECT OR RESIDENT) <br />.O 1 <br />JIB <br />DRAWAG NO. <br />W' <br />a¢o <br />00177-1 <br />O <br />PROJECT STARTED <br />�� <br />_ <br />C <br />PROJECT COMPLETED <br />RECORD DRAAINGS APPflOYED qT: <br />Ql <br />C <br />W JI <br />TITLE: DATE <br />C <br />N 2 <br />�o <br />Uf <br />DcQi <br />Ipa' <br />CONTRACTOR SHALL FIELD LOCATE ALL ABOVE AND BELOW GROUND <br />PIPES, STRUCTURES, AND UTILITIES PRIOR TO CONSTRUCTION. <br />� I <br />DRAWAG NO. <br />00177-1 <br />— 0 0 0 1 0 z 0 a <br />I <br />NO <br />t <br />j <br />f <br />