My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-05-31_REVISION - M2000116
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000116
>
2006-05-31_REVISION - M2000116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 6:19:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000116
IBM Index Class Name
Revision
Doc Date
5/31/2006
Doc Name
Financial Warranty Increase
From
DMG kap
To
J and K Limestone Products LLC
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADASLE EQUIPMENT <br />Machine sheet 2 of 2 <br />Total Fleet Size Haul Trip Return Trip <br />Description CasUhour/unit (No. units) CosUhr/fleet CosUhr/fleet <br />-Light Duty Pickup, 4x4, 3/4 T. $27.73 1 $2773 $27.73 <br /> Subtotals :I $27.73 $27.73 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest m ajor city or town within project area region : Alamosa <br />Transportation Cvcle Time ~ Nan- Total one-way travel distance : 50 <br />0 <br /> <br />Roadable <br />Roadable <br />Average travel speed : . <br />miles <br />45.0 mph <br /> Equipment Equipment <br />Haul fime (hours) = 1.11 1.11 Total non-roadable mob/demob cost' : $3 <br />471 <br />13 <br />Return time (hours) = 1.11 1.11 'two round trips with haul rig , <br />. <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost " : $61 <br />63 <br />Unloading time (hours) = 0.50 NA " . <br /> one round tdp, no haul rig <br />Subtotals = 3.22 2.22 <br />JOB TIME AND COST "' `' <br />Total job time : 6.44 hours <br />. _...... Total iob cost : Q3 533 <br />
The URL can be used to link to this page
Your browser does not support the video tag.