Laserfiche WebLink
ROADASLE EQUIPMENT <br />Machine sheet 2 of 2 <br />Total Fleet Size Haul Trip Return Trip <br />Description CasUhour/unit (No. units) CosUhr/fleet CosUhr/fleet <br />-Light Duty Pickup, 4x4, 3/4 T. $27.73 1 $2773 $27.73 <br /> Subtotals :I $27.73 $27.73 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest m ajor city or town within project area region : Alamosa <br />Transportation Cvcle Time ~ Nan- Total one-way travel distance : 50 <br />0 <br /> <br />Roadable <br />Roadable <br />Average travel speed : . <br />miles <br />45.0 mph <br /> Equipment Equipment <br />Haul fime (hours) = 1.11 1.11 Total non-roadable mob/demob cost' : $3 <br />471 <br />13 <br />Return time (hours) = 1.11 1.11 'two round trips with haul rig , <br />. <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost " : $61 <br />63 <br />Unloading time (hours) = 0.50 NA " . <br /> one round tdp, no haul rig <br />Subtotals = 3.22 2.22 <br />JOB TIME AND COST "' `' <br />Total job time : 6.44 hours <br />. _...... Total iob cost : Q3 533 <br />