Laserfiche WebLink
Materials -item no.l :Straw, de <br />-item no. 2 : Herbicide <br />-item no. 3: <br />-item no. 4 <br />a source) UNITS/ACRE UNIT COST/UNIT COST/ <br />NG survey data) 1.59 ton $99.62 $14<, <br />1 /b/ac. 7.90 acre $7.63 $7. <br />TOTAL MULCH MATERIALS COST/ACRE: $l5i <br />FORBS : ... .. .. .. <br />sheet 2 of 2 <br />Aoolication -method no.7:POwer mulcher (MEANS 029705000350) $61.86 <br />- methotl no. 2 : Crimping, with tractor (OMG survey data) $55.59 <br />-method no. 3 : Weed sprey, frock, non-aquatic area, nox. (OMG] 850.77 <br />TOTAL MULCH APPLICATION COST/ACRE: $168.22 <br />NURSERY STOCK PLANTING ~ TYPE and SIZE MATERIAL PLANTING ~~COST/FERT.~ TOTAL TOTAL <br />COMMON NAME NO. /ACRE L_ (planting cost tlata source) l COST /PLANT COST / PLANT PELLET I COST / PLANT COST /ACRE <br />No nursery stock required <br />TOTAL NURSERY STOCK COS7/ACRE: <br />JOB COST No. of acres: 38.00 COST/acre: $65019 INITIAL JOB COST: $24,770.85 <br />Estimated failure rate (percent): 25.00% Cosl/acre': $650.19 RESEEDING JOB COST: $8,177.71 <br />' Selected replanting work items : F T S M TOTAL JOB COST : $30,889 <br />Seetl aooliwtion -methotl :Drill seeding {OMG survey data) TOTAL SEED APPLICATION COST/ACRE: $74.78 <br />