My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-05-31_REVISION - M2000116
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000116
>
2006-05-31_REVISION - M2000116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 6:19:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000116
IBM Index Class Name
Revision
Doc Date
5/31/2006
Doc Name
Financial Warranty Increase
From
DMG kap
To
J and K Limestone Products LLC
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 05/26/2006 <br />User : KAP <br />State :Colorado PermiUjob# : M-2000-116 <br /> <br />County :Saguache Abbreviation :none <br />Site :Villa Grove Pit Filename :Mt 16-002 <br />Agency or organization name :Colorado Division Of Minerals And Gec <br />Permit or other job action :Bond Recalculation related fo Inspectic <br />Task description :Rough grade pit floor prior to <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Basic machine : Cat D8R Series II - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :BOPS Cab <br />Attachment no. 2 :3-shank ripper <br /> <br />Ownership cost/hour <br />Operating cosUhour <br />Ripper ap. costlhour <br />Operator cosUhour <br />Total unit cosUhour <br />Utilization <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />$53.92 NA <br />$75.29 100 <br />$0.80 10 <br />$32.53 NA <br />~, $162.54 Total fleet cosUhour : $162.54 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />3 LCY <br />9 factor : NA volume : <br />g73 <br />20, <br />tCY <br />7 <br />volume : 20, <br />rce of estimated volume : <br />S Assume f 3 acres floor graded at 1 ac ft/ac <br />ou <br />Source of estimated swell factor: NA <br />N <br />Job Condition Correction Factors <br />Source <br />HOURLY PRODUCTIO 75 (avg <br />) <br /> Operator skill : 0. . <br />Average push distance : 50 feet Material consistency : 9.00 <br />00 <br />1 (Cat HB) <br />) <br />(9en <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : . <br />00 <br />9 ~ <br />(avg <br />) <br /> Visibility : . . <br /> Job efficiency : D.83 (lshifUday) <br />Material consistency description <br />Spoil pile : <br />O.SD <br />rind-rf) <br />Consolidated stockpile 00 <br />1 (Cat HB) <br /> Push gradient ; . <br /> e <br />) <br />% ( <br />Altitude : <br />1.00 <br />(Cat HB) <br />Average push gradient : 0.00 n <br />g 71 <br />0 (Cat HB) <br />Average site altitude : 7,855 feet Material weight : . <br />00 <br />1 (S/SU/U) <br /> Blade type : . <br />250 <br />3 Ibs/LCY Net correction : 0.35 <br />, <br />Material weight : <br />Weight description <br />Adjusted unit production : <br />492.70 <br />LCY/hr <br />Gravel - Pitrun Adjusted fleet production : 492.70 LCY/hr <br />,., <br />JOB TIME AND COST <br />1 <br /> <br />Dozers) <br /> <br />Total job time : <br /> <br />42.57 <br /> <br />Hours <br />Fleet size : <br />Unit cost : $0.330 /LCY Total lob cost : $6,919 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.