. ,. <br />t,. <br />;~ 9 <br />amund~the crest of those portions of the mines where highwalls of greater than approximately 30 feet <br />("height to depth") exists. As with Amendment No. 7, chain link fence was selected because it is more <br />eiipensive to install than earthen berms or safety benches. CC&V proposes to retain the option approved <br />under Amendment No. 7 of installing earthen features. <br />E, ~n=Fdg"e~108 the operator states, "as demonstrated to date by CC&V operations. there is no evidence <br />that `tiler will be impounded in the mine areas upon completion of mining. The Divisio» will agree, <br />water"~t~ill not be impounded for a longpertod within the pit areas. However, there will always be <br />tempdrary ponding after a precipitation event as evidenced in the Iron Clad and Globe Hill pits prior to <br />them being bac~lled. Please clarify your Statement. <br />Y <br />Response: CC&V concurs with the OMLR's clarification that some temporary seasonal ponding may occur in <br />the.surface mine areas. Such seasonal ponding will ba short term snd dependent on the amount of <br />precipitation received. In making the above referenced statement, CC&V was referring to the lack of <br />evidence. that the mines could become flooded in a manner that could create either an intermittent or <br />perennial water impoundment of any size. <br />F. Thefnal topography shown on brewing E-1 for the East Cresson mine bacl~ll is conceptual. In order <br />td properly evaluate the financial warrany, the Division needs to know the actual configuration and the <br />,dot/FC'e'bf the material to achieve the desired past-mining configuration. Please provide the appropriate <br />map.oi+:maps in accordance with the Rule 6.4.6(a) and (h). Also refer to 6.4.4(L)(i) <br />Responso,:'Coittour intervals and elevations have been added to Drawing F-1. The revised drawing is included <br />as Attachment 5. The baekfllltng depicted wi116e conducted with available material from other mined <br />t areas: x1s is the case with all disturbance and reclamation shown on Arawings C-4 and F-1, <br />respectively, the contours are based on the information available to CC&V at this time, As with any of <br />the_ overburden storage areas, if the overburden currently planned to be placed in this area is not <br />enooua'tered (as a result of encountering less overburden for the accompanying ore or as a tesult.of not <br />mininpas much as is currently planned) [he contours that are actually achieved wi116e different and <br />will; possibly, be at a lower overall elevation than shown in Drawing F-1. The financial warranty is <br />consar+iative, that is it is overestimated, because it addresses the grading and revegetation o£the lazgest <br />disturbed area that would be involved. <br />~; <br />G. Under the Phase IV VLF Reclamation, the operator stares "ore which lies beneath the liner for the <br />Phase IVPSSA, will be accessible by sprinklers placed om top of the VLF. Upon completion of rrnstng <br />of the-VLF, holes will be drilled through the Phase 1'YPSSA liner. Water and hydrogen peroxide (HsO~ <br />will be~inrroduced to the underlying ore through these holes. Prior to puncturing holes through the <br />liner,.Ehe operator has to obtain approval from the Division. The upper leachate solution from the ore <br />has to rneet all applicable water standards and 0.2 mgll WAD CNsta»dard set 6y the Division. <br />„ ' `a <br />Response: ~ ~GC,BcV will obtain OMLR approval prior to puncturing the phase N PSSA liner. However, CC&V <br />would`1ike to point out that the Phase III liner system lies beneath the azea in question and, once the <br />Phas~);V PS5A liner is punctured, detoxified water will continue to be contained within the VLF and <br />recirculated for ongoing dctaxiFication. <br />} . <br />The statement that "the upper leachate solution from the ore has to meet all applicable water standards <br />and 0.2 mgll 'WAD CN' does not appear to recognize that detoxified solutions from above the <br />punchired Phase IV PSSA liner will continue to be contained within the VLF system. <br />,: 's, <br />H. The It'on Clad Mtll tailings will have to be detaxifed to meet all applicable water standards including <br />WAD CNprior to removal and placement in another location, unless the material is placed on the VLF: <br />x• <br />;: <br />