Laserfiche WebLink
<br /> <br /> ? <br />~ <br /> ` <br />.:~ 13 <br /> <br />k. <br />Should:;use of the extemal ponds become necessary, based on a potential to exceed the 80% operational <br />capacity`; for the VLF, CC&V will begin detoxification of solution pumped to the external ponds and <br />will increase recirculation of excess solutions froth the P55As onto the VLF. If the average of the water <br />level readings for any one of the PSSAs exceeds 80 percent of the total capacity in a sustained manner, <br />the OMLR will be notified of such occurrence within 24 hours. <br />ri <br />F The apErator has included a fnancial warranty for reclamation of the storm water sediment collection <br />ppnds,wrth a typical design. Since the reclamation warranty is submitted to reclaim These ponds the <br />Division will require the detailed design for these ponds to make sure adequate warranty is in place to <br />ter%aim;these ponds. <br />:.,`,;; <br />~~:•~ <br />Response: The warranty calculations are strictly for revegetation of the basin area following construction since <br />it is anticipated that these structwes will be retained after operations. If it is decided it would 6e <br />beneficial to remove the sediment detention basins in the future, the as-built information will be used to <br />dcyelop the appropriate financial warranty amount at that timc. This will 6c provided to the OMLR as <br />part ofshe periodic financial warranty review and update process. <br />G. Under Monltortng Page 9$, the operator states, "the underdrains 30-day average of CN WAD for the <br />underdrain exceeds !.0 mg11 and the 30-day running average. " T7iis is not correct. As the operator is <br />aware, tthe Division agreed to .S mP/1 maximum WAD CNfor the underdrain, due to the use of the Cron <br />Clad clayfor Phase I, which was detoxified to .S WAD CN. CC&Yw111 not fy the Division within 24 <br />hours; if the WAD CN is exceeded and proceed wtlh dally sampling as approved fn the Conditinti and in <br />the event that exceedance ~;r not a one time only occurrence, submit a remedial plan within 30 days, <br />Pleaserefer to original adequacy under AM-07 addressing the same tssue. Please remove all reference <br />ta. ~.O;mgR WAD CNfor the underdrain discharge from the text Please also remove the statement on <br />page 9~ which states, "CN WAD concentration must be accompanied by commensurate level of the Free <br />CM's'?Tlte standard was set for WAD CN not Free CN. <br />s; <br />Response: CC&V agrees to revise the maximum 30-day average for WAD CN in the underdrain to 0.5 mg/1. <br />Enclosed in Attachment 7 are revised replacement pages 98 and 99 for the Amendment No. 8 <br />application in response to the OMLR's request related to this matter. <br />.•. ;., ;; <br />Similarly, the discussion of the CN WAD concentration being accompanied by a commensurate level of <br />Free CN will be removed from the underdrain and LDS discussions. Enclosed in Attachment 7 are <br />tevised~replacement pages 98 and 99 for the Amcndment No. 8 application in response to the OMLR's <br />reques4 related to this matter. <br />H. The operator will notify the Division immediately when the maximum head as recorded by the <br />transducers in the HYSCS in Phase I, 77, and IY exceeds 80%, the LYSCS or LDCRS and external ponds <br />is.greater than 2 feet. If the condition is hat temporary, CC&Y must implement a plan to !owes the . <br />heard immediately. <br />;. ;,:~: <br />Response:; CeGBcV agrees that it will notify the OMLR within 24 hours if the average of the water level readings <br />the FNSCS for Phases I, II and N exceeds 80% of the total capacity or if the water level in the <br />LVSCS or LDCRS for the VLF or the External Ponds is greater than 2 feet in a sustained manner. If the <br />condition does not return to ievcls below those specified within another 24-hour period, CC&V will <br />implement a plan to lower the head. Note that the term "inunediately"has not been a requirement in <br />previous approvals; rather, a 24-hour notification requirement has been imposed for norifying the <br />OMLIt of the exceedenee of the 80% capacity and CC&V plans to continue this notification procedure <br />in Amndment No. 8. <br />c..~: <br />~i~~_ i; <br />?: <br />