Laserfiche WebLink
MAR-10-03 04:36PM FROM-Henderson Mina 2nd Floor <br />Letter to Ms. Lurlina Underbrink-Curran <br />303 566 2630 T-916 P.004/005 F-637 <br />and operation of dte inlet/outlet structure at the tailing impoundment and the other <br />water storage reservoirs located on the property. At closure, Climax Molybdenum <br />Co. may choose to sell some assets in the Williams Fork Valley or pursue other <br />income generating oppom~nities, but will retain the environmental liability and any <br />water treatment obligations related to the tailing deposition area. <br />3. Water treamtent. The financial warranty covers only the reclamation and <br />environmental obligations during reclamation. Henderson, as stated above, will <br />retain responsibility for water treatment obligations that may exist post-closure. <br />4. Reclamation Costs. The objective of the wet cover is not to reduce the financial <br />warranty. This amendment is intended to improve the level of reclamation to meet <br />current industry standards. We have not evaluated the costs for this alternative, but <br />expect that the overall cost of a wet cover will not be significantly different than the <br />cost for a dry cover. <br />5. Droueht effects and water rights- CMC is in the process of moving water storage <br />rights to the tailing impoundment. Those rights will be adequate to allow storage of <br />water on the impoundment for the wet cover. The only consumptive use anticipated <br />by the cover is from evaporation. CMC's current water rights in the Williams Fork <br />will be more than adequate to meet this incidental depletion. Once completed, a <br />drought should not have a significant impact on the wet cover. Should the reclauned <br />tailing impoundment be used as a water resource reservoir, the parry malting use of <br />the storage would supply the rights. <br />6. Negative effects of a breach. etc. Obviously, a breach would have significant off-site <br />impacts, Henderson has hired outside consultants to complete a dam stability <br />analysis and an evaluation of extreme precipitation events possible at the rnillsite. <br />The risk of a breach of the tailing impoundment under the wet closure scenario is <br />exhemely unlikely. In fact, we believe that the risks are greater under a dry cover <br />analysis since it does not include a passive method to remove water from the surface <br />of the reclaimed tailing impoundment. <br />,As I stated during our meeting, Henderson is willing to present our engineering design <br />for the wet cover in an amendment to the reclamation permit rather thav using the less <br />formal technical revision process. In fact, we have notified the Division that we will <br />submit future details on the wet closure scenario by amendment. <br />ON-SITE LANDFILLS <br />The issue of on-site landfills is not a pan of our current amendment. In fact, the inert <br />debris landfills proposed in TR-12 were approved when the State approved that technical <br />revision on January 24, 2003. Henderson has always complied with all applicable <br />landfill regulations. As with all other aspects of our operation, we will not construct any <br />new landfills without first obta'n'ng the required permits. Should this include a County <br />pemmt, we will apply for one. <br />We believe that the Covnty's letter mis-characterizes Henderson's us of its on-site <br />landfill. This landfill does NOT operate "with no oversight" as the county alleges. <br />Although exempt from Certificate of Designation (CD) requirements, the landfill is not <br />