My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-10_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2003-06-10_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:32 PM
Creation date
11/21/2007 6:17:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
6/10/2003
Doc Name
Permit Amendment Approval
From
DMG
To
Climax Molybdenum Company
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 06~1un-2003 Permit or job no. <br />User : ACS Abbreviation <br />Task : OOc Filename <br />Agency or organization name :DMG <br />M-1977-342 <br />none <br />M342-OOc <br />Site :Henderson Mine <br />State :Colorado <br />County :Grand <br />Permit or job action :Amendment AM-04 <br />Task description :Summary (Tasks 09h-16c) revised 6-6-03 <br />TASK LIST /DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />09h -Revegetate Borrow Pit & Tailings Pond; Drill Seed revege 1 200.0 $895,528 <br />09i -Plant trees & shrubs on tree "islands" & in borrow pit (AM-04) revege 1 30.0 $489,348 <br />09% -Maintenance FeRedize Tailings Pond & Misc. Area- 2X revege 1 40.0 $127,478 <br />09k -Revegetate Perimeter Road; tree & shrub transplants revege 1 40.0 $157,042 <br />091 -Grade Bypass Canal Road dozer 1 172.5 $25,416 <br />09m -Revegetate Bypass Canal Road; drill seed revege 1 20.0 $32,833 <br /> Buffer Area Reclamation; included in Task Olv (TR-12) <br />090 -Rip Perimeter Road ripper 2 102.51 $31,607 <br />f0a -Backfill & Grade Gravel Pit and Storage Yard dozer 2 86.2 $24,741 <br />106 -Replace Topsoil on Gravel Pit & Storage Yard scraped 1 16.2 $10,674 <br />10c -Revegetate Gravel Pit & Storage Area; Drill Seed revege 1 40.0 $28, 729 <br />10d -Revegetate Gravel Pit & Storage Yard; tree 8 shrub transplants revege 1 40.0 $58,473 <br />foe -Maintenance Fertedize Gravel Pit & Storage Yard- 4X revege 1 32.0 $5,761 <br /> Buffer Area Reclamation; included in Task Ol v (TR-12) <br /> <br />11a -Backfill & Grade Railroad Gravel Pit dozer 1 73.9 $10,603 <br />f fb -Revegetate Railroad Gravel Pit; Drill Seed revege 1 8.0 $4,104 <br />llc -Revegetate Railroad Gravel Pit; tree & shrub transplants revege 1 16.0 $8,353 <br />11 d -Maintenance Fertedize Railroad Gravel Pit- 4X revege 1 16.0 $720 <br /> <br />12a -Maintenance Fertedize Contractors Camp & Storage Area- 3X revege 1 18.0 $1,081 <br /> <br />13a -Revegetate Borrow Area; Orill Seed revege 1 8.0 $2,462 <br />13b -Maintenance Fertedize Borrow Area- 4X revege 1 8.0 $144 <br /> <br />14a -Demolish Powedine demolish 1 150.0 $60,411 <br />146 -Backrll & Grade Powedine/Refuse Area dozer 1 92.7 $13,303 <br />14c -Revegetate Powedine/Refuse Area; Drill Seed revege 1 8.0 $5, 746 <br />14d -Maintenance Fertedize Powedine/Refuse Area- 3X revege 1 20.0 $2,042 <br /> <br /> Makeup Water Line/Pumphouse; Remain in Place (TR-12) <br />15b -Backrll & Grade Makeup Water Line/Pumphouse Area dozer 1 22.5 $3,237 <br />15c -Revegetate Makeup Water Line/Pumphouse; Drill Seed revege 1 4.0 $821 <br />15d -Maintenance FeRedize Makeup Water Line/Pumphouse; 3X revege 1 12.0 $961 <br /> <br />16a -Dismantle Tailing Delivery Line & Concrete Drop Towers demolish 1 150.0 $211,063 <br />166 -Backfill & Grade Tailing Line/Powedine Area dozer 1 167.5 $24,033 <br />f6c -Revegetate Tailing Line/Powedine; Drill Seed revege 1 8.0 $8,208 <br /> <br />SUBTOTALS : 1,602.2 $2,244,922 <br />
The URL can be used to link to this page
Your browser does not support the video tag.