Laserfiche WebLink
CIRCES Cost Estimatinsl Software <br />PROJECT IDENTIFICATION <br />Date : 06.1un-2003 Permit or job no. <br />User: ACS Abbreviation <br />Task : OOa Filename <br />M-1977-342 <br />none <br />Site :Henderson Mine <br />State :Colorado <br />County :Clear Creek <br />M342-OOa <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit orjob action :AmendmentAM-04 <br />Task description :Summary (Tasks 01a-03i) revised 12-30-02 and 6-6-03 <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />01 a -Mine site structural demolition pg 1 (TR-12 6 AM-4) demolish 1 280.0 $495,118 <br />Ola -Mine site structural demolition pg 2 (TR-12 8 AM-4) demolish 1 280.0 $241,698 <br />Ofa -Mine Site Structural Demolition- Removal of Chemicals (pg. 3) demolish 1 40.0 $69,301 <br />Olb -Seal Mine Shafts (#1, #2, #3, #5) mineseal 1 200.0 $494,341 <br />Ofc -Remove Culvert from West Clear Creek demolish 1 80.0 $33,786 <br />Ofd -Excavate West Clear Creek Channel & Cover Demolished Concrete truckl 1 775.5 $378,396 <br />Ofe -Reestablish West Clear Creek NA 1 80.0 $22,758 <br /> Task Olf, reestablish Butler Gulch, eliminated through AM-4 <br />01g -Backfill & Grade Pond 1 dozer 1 22.0 $3,170 <br />Olh -Backfill & Grade Pond 1.1 dozer 1 7.8 $1,128 <br />01i -Backfill 8 Grade Pond 1.2 dozer 1 27.61 $3,962 <br />01j -Purchase/Haul/Spread Cap Barrier on Pond 1.2 truckl 1 3.6 $22,442 <br />01k -Purchase/Haul/Spread Grow[h Media on Pond 1.2 tmckl 1 6.7 $35,077 <br />Oll -Backfill 8 Grade Pond 2 dozer 1 24.9 $3,584 <br />01 m -Rip Roads around Mine Site ripper 1 49.3 $7,600 <br />Oln -Finish grade mine site (AM-04) grader 1 89.7 $10,268 <br />Olo -Apply agricultural lime (AM-04) NA 1 16.6 $980 <br />Olp -Wood Chips & Sewage Sludge (Purchase/Haul) NA 1 40.0 $57,600 <br />01q -Mix wood chips and sewage sludge into soil (AM-04) dpper 2 218.0 $67,241 <br />Ofr -Revegetate mine site, drill seed slopes <3h: fv (AM-04) revege 1 51.8 $49,578 <br />Ofs -Revegetate mine site, hydroseed slopes >3h:ly (AM-04) revege 1 52.9 $86,521 <br />01t -Revegetate mine site, tree and shmb planting (AM-04) revege 1 100.0 $167,106 <br />Ol u -Maintenance fertilize mine site- 3x (AM-04) revege 3 24.0 $12,012 <br />01V -75-Acres of Buffer Area Reclamation (TR-12) NA 1 1.0 $78,975 <br /> <br />02a -Remove Exhaust Collar & Seal Shaft mineseal 1 80.0 $46,276 <br />026 -Revegetate Vent Shaft Area; hand seed 1 acre revege 1 8.0 $3, 701 <br /> <br />03a -Portal Area; Structural Demolition (TR-12) demolish 1 150.0 $22,100 <br />036 -Seal Portal Tunnel (TR-12) mineseal 1 150.0 $505,143 <br />03c -Rip Portal Facility Area dpper 1 49.7 $7,511 <br />03d -Backfill & Grade Podal Facility Area dozer 1 112.7 $16,175 <br />03e -Reestablish the Williams Fork Drainage excavate 1 29.4 $2,573 <br />03f -Revegetate Portal Area revege 1 20.0 $17,237 <br />03g -Maintenance Fertedize Portal Area- 1X revege 1 4.0 $1,808 <br />03h -Revegetate Portal Area; tree & shrub transplants revege 1 40.0 $35,084 <br />03i -Road Bddge Removal on Williams Fork Drainage demolish 1 80.0 $13,602 <br /> <br /> <br />SUBTOTALS: 3,195.8 53,01$852 <br />