My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-10_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2003-06-10_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:32 PM
Creation date
11/21/2007 6:17:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
6/10/2003
Doc Name
Permit Amendment Approval
From
DMG
To
Climax Molybdenum Company
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinsl Software <br />PROJECT IDENTIFICATION <br />Task # : 01q <br />Date : 06/06/2003 <br />User : ACS <br />State :Colorado <br />County :Clear Creek <br />Site :Henderson Mine <br />PermiUjob # : M-1977-342 <br />Abbreviation :none <br />Filename : M342-O1q <br />Agency or organization name :Colorado Division Of Minerals And Geo/ogl <br />Permit or other job action :Amendment AM-04 <br />Task description :Mix sludge and wood chips into soil <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - SSU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />Horsepower: 305 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $50.41 NA <br />Dozer operating cosUhour : $65.98 100 <br />Ripper operating cosUhour : $9.78 100 <br />Operator cosUhour : $27.99 NA <br />Total unit costlhour : $154.17 Total Fleet cost(hour : $308.33 <br />MATERIAL QUANTITIES <br /> Selected estimating method : Aiea <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 100.00 acres Rip depth (tt) : 2.00 Volume : 322,667 BCY or CCY <br /> <br />Source of estimated quantity :Ong. application section 9-9, as modified by AM-4 <br />Source of estimated load factor : NA <br />.:~:.. ,: .s: <br />HOURLY PRODUCTION . ::z ..;.r . .; ..,:.. .:.~:. .;:. .,, <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 948.22 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.00 feeUpass Site altitude : 10,900 feet <br />Average ripping width : 5.56 feet/pass Altitude adjustment : 0.94 (Cat HB) <br />Average ripping length : 150.00 feeUpass Job efficiency factor : 0.83 (1 shifUday) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.78 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.588 acres/hour Adjusted unit production : 739.80 cu. yds./hour <br />Unadjusted production : 948.22 cu. yds./hour Adjusted fleet production : 1,479.60 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 2 dozers) Total job time : 218.08 hours <br />Unit cost : $0.208 per cu. yd. Total job cost : $67,241 <br />upon appYl of <br />
The URL can be used to link to this page
Your browser does not support the video tag.