My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-05_REVISION - M1980244
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2003-06-05_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:53 PM
Creation date
11/21/2007 6:16:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
6/5/2003
Doc Name
Riser Pipe Modifications
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Golder Associates Inc. <br />44 Unian Boulevarq, Suiie 300 <br />Lakewood. CO USA 80228 <br />Telephone (303) 980-05A0 <br />Fax (303) 985-2080 <br />June 2, 2003 <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, Colorado 80860 <br />Attention: Mr. Ron Roberts <br />RE: RISER PIPE MODIFICATION -RFI NO. 104 <br />Dear Ron: <br />a Golder <br />ASSOCI2~eS <br />Our Ref: 003-2203 <br />lUN 0 5 2003 <br />piviston ~I Mlnecals and Geolo9V <br />Golder Associates Inc. (Golder) has prepazed this letter for the Cripple Creek & Victor Gold Mining <br />Company (CC&V) regarding Request For Information (RFI) No. 104 submitted by Ames <br />Construction. RF[ No. 104 presents a proposed modification to the riser pipe configuration. The <br />proposed modification consists of replacing the 26" HDPE pipe lengths entering the Phase IV PSSA <br />sump with steel piping. <br />Golder has reviewed the proposed modification and agrees that steel pipe may be used to replace the <br />HDPE pipe lengths in the sump. The steel pipe must have the same wall thickness (schedule 40) as <br />the steel stub pipe material. <br />Golder appreciates the ongoing opportunity to provide engineering services for the Cresson Project. <br />Please contact the undersigned with any questions. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />Jo - .Lupo, Ph.D., P.E. <br />Sr. Project Manager <br />~eo~zzo?~oioowo?zzo?.o~ai.ozaox~~~~.aw.~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.