My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-10-16_REVISION - M1988081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988081
>
2006-10-16_REVISION - M1988081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:27:07 PM
Creation date
11/21/2007 6:16:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988081
IBM Index Class Name
Revision
Doc Date
10/16/2006
Doc Name
Letter re SO03 and Financial Warranty Increase
From
DRMS
To
Harry Covey
Type & Sequence
SO3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Date : 16-Oct-2006 Permit or job no. <br />User : ESC Abbreviation <br />Filename <br />Agency or organization name :DRMS <br />Permit or lob action :Reevaluate Amount of <br />M-1988.081 <br />none <br />M081-000 <br />auired Bond <br />Site :Phil Sheridan Lode <br />State :Colorado <br />County :Boulder <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Secure Shaft Closure mineseal 1 4.0 $500 <br />002 -Remove Mine Structures mineseal 1 40.0 $1,633 <br />003 -Bac~ll Site to Achieve 3h:1v dozer 1 3.3 $548 <br />004 -Revegetate Affected Land ravage 1 8.0 $1,528 <br />005 -Mobilization/Demobilization mobilize 1 3.1 $1,461 <br /> suerorALS: 58.4 $5,670 <br />• inclutles inflation factor adjustment of: NA % TOTAL DIRECT COST • _ $5,670 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability inSUranC@ : 2.02 ~ OfdireCl total = $115 <br />Performance bond : 1.05 % of direct total = $60 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % o/direct total = $567 <br />• not required (or eqp. operator serves as super) TOTAL O 8 P = $741 <br />LEGAL-ENGINEERING•PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+08P)= $6,411 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $321 <br />CONTINGENCY • NA' NA total = NA <br />•condnpencles accounted ror at task level TOTAL INDIRECT COST= $1,082 <br /> TOTAL 80ND AMOUNT (direct + indirect) _ $8,732 <br />
The URL can be used to link to this page
Your browser does not support the video tag.