Laserfiche WebLink
CIRCES Cost Estimating Software <br />Date : 16-Oct-2006 Permit or job no. <br />User : ESC Abbreviation <br />Filename <br />Agency or organization name :DRMS <br />Permit or lob action :Reevaluate Amount of <br />M-1988.081 <br />none <br />M081-000 <br />auired Bond <br />Site :Phil Sheridan Lode <br />State :Colorado <br />County :Boulder <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Secure Shaft Closure mineseal 1 4.0 $500 <br />002 -Remove Mine Structures mineseal 1 40.0 $1,633 <br />003 -Bac~ll Site to Achieve 3h:1v dozer 1 3.3 $548 <br />004 -Revegetate Affected Land ravage 1 8.0 $1,528 <br />005 -Mobilization/Demobilization mobilize 1 3.1 $1,461 <br /> suerorALS: 58.4 $5,670 <br />• inclutles inflation factor adjustment of: NA % TOTAL DIRECT COST • _ $5,670 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability inSUranC@ : 2.02 ~ OfdireCl total = $115 <br />Performance bond : 1.05 % of direct total = $60 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % o/direct total = $567 <br />• not required (or eqp. operator serves as super) TOTAL O 8 P = $741 <br />LEGAL-ENGINEERING•PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+08P)= $6,411 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $321 <br />CONTINGENCY • NA' NA total = NA <br />•condnpencles accounted ror at task level TOTAL INDIRECT COST= $1,082 <br /> TOTAL 80ND AMOUNT (direct + indirect) _ $8,732 <br />